
11
9
209
11
12
4
13
256
11
13
9
Air
24
Air
2
Counterhold!
9
14
35
34
7
8
6
157
156
120
138
1
33
14
28
9
31
67
87
16
18
97
4
12
13
11
87
31
67
256
9
209
13
BARDIANI VALVOLE reserves the right to modify without notice its products, including products already ordered.
(GB-IST-BBZS1-0413)17/22
6. CYLINDER 108-134:
Put the pivot (11) into the cylinder (9).
1.
Insert to the piston (13) the
seal ring (4 and 12).
3.
Insert into the cylinder (9) the pivot
piston (11-13) and the seeger (256).
COUNTERHOLD!
COUNTERHOLD!
2.
Assemble the piston (13) on
the pivot (11)and screw the nut
(209) counterholding the pivot
(11) with an allen wrench.
4.
Assemble the seal ring (87) on the upper piston (67).Insert into
the cylinder (9) the spring (31) and the upper piston (87). Assmbly
the seal ring (16) on the stopper (18)
and paying attention to the
preload of the spring
, screw the stopper (18) on the cylinder (9).
5. CYLINDER 108-134:
Insert the seal rings (4,12) and the guide
bushing (97) on the piston (13), block the
piston with the nut (209) on the pivot (11),
counterholding the pivot with an allen wrench.
7. CYLINDER 108-134:
Assembly on the cylinder (9) the seeger (256) and insert the
spring (31). Assembly on the upper piston (67)the seal ring
(87) and insert them inside the cylinder (9).
12. Assembly of the BBZS5 - BBYS5