Technical data
EN-IST-BBZK-0721
3 Technical data
VALVE DATA
Maximum pressure
10 bar
Maximum seal pressure
See catalogue
Pneumatic actuator pressure range
3 - 15 psi (0.21 - 1.05 bar)
6 - 18 psi (0.42 - 1.25 bar)
6 - 30 psi (0.42 - 2.07 bar)
9 - 32 psi (0.62 - 2.21 bar)
Material in contact with the product
AISI 316L (1.4404). Check the resistance to corrosion in
relation to products and detergents
Gasket material in contact with the
product
EPDM, FKM, HNBR, P.T.F.E. and other gaskets on request.
Check compatibility with products and detergents
Surface finish in contact with the
product
Ra 0.8 µm. Other finishes available on request
Pneumatic actuator stroke
15 - 20 mm
VAPOUR BARRIER DATA
Connectors
1/8” BSP
Steam maximum temperature
130°C
Gaskets
FKM
GASKET MATERIALS COMPATIBILITY
Product
EPDM
FKM
HNBR
MVQ
Temperature (applications with air)
from -10 to 140°C
from -10 to 200°C
from -10 to 130°C
from -70 to 230°C
Caustic soda 2%
60°C
30°C
To be checked Unsuitable
Nitric Acid 2%
60°C
80°C
To be checked Unsuitable
Saturated steam 125°C
Suitable
To be checked Suitable
Unsuitable
Greases
Unsuitable
Suitable
Suitable
Unsuitable
Alcohols
Suitable
Unsuitable
Suitable
Suitable
The valve complies with PED 2014/68/EU directive, with special reference to
Annex III, Module A, concerning internal manufacturing checks as indicated in the
Conformity Assessment Procedures.
Valves with DN equal or smaller than DN25 are not included in compliance with Article 4, paragraph 3.
Valves designed for use with gases, liquefied gases, gases dissolved under pressure, vapours and also those liquids whose
vapour pressure at the maximum allowable temperature is greater than 0,5 bar above normal atmospheric pressure (1
013 mbar) are included within the following limits:
- valves with DN between DN32 and DN100 (included) with group 1 fluids;
- valves with DN125 or bigger with group 2 fluids.
The end user is asked to carry out the acoustic emission tests once the valve has been installed in the destination
plant.
In the event of any doubt, please contact Bardiani Valvole S.p.A.
Summary of Contents for BBZK
Page 2: ...2 EN IST BBZK 0721 MANUAL REVISION DATE...
Page 32: ...32 10 Maintenance EN IST BBZK 0721 10 3Tools useful for Disassembly Reassembly TOOLS Soft...
Page 37: ...37 3 1 a1 10 Maintenance EN IST BBZK 0721...
Page 38: ...38 1 33 1 a2 10 Maintenance EN IST BBZK 0721 Normally open...
Page 39: ...39 4 5 2 2 14 6 7 2 33 10 Maintenance EN IST BBZK 0721...
Page 41: ...41 16 15 14 54 122 15 24 10 Maintenance EN IST BBZK 0721...
Page 43: ...43 3 4 b1 b1 1 10 Maintenance EN IST BBZK 0721...
Page 44: ...44 1 33 1 2 b2 b2 10 Maintenance EN IST BBZK 0721 Normally open...
Page 45: ...45 3 b2 1 2 10 Maintenance EN IST BBZK 0721...
Page 46: ...46 23 238 128 2 5 6 7 8 50 120 2 2 14 10 Maintenance EN IST BBZK 0721...
Page 47: ...47 11 10 9 54 122 15 24 10 Maintenance EN IST BBZK 0721...
Page 48: ...48 A B A M BBZK B M BBWK1 10 Maintenance EN IST BBZK 0721 10 6Assembly of the BBZK BBYK BBWK1...
Page 49: ...49 1 14 a b c A M BBZK 10 Maintenance EN IST BBZK 0721 A Assembly of the BBZK BBYK...
Page 50: ...50 1 2 3 122 15 54 4 2 10 Maintenance EN IST BBZK 0721...
Page 53: ...53 2 14 2 50 13 14 15 10 Maintenance EN IST BBZK 0721...
Page 54: ...54 1 33 1 2 3 2 16 17 18 a1 a1 a1 10 Maintenance EN IST BBZK 0721 Normally closed...
Page 55: ...55 1 33 2 16 a2 10 Maintenance EN IST BBZK 0721 Normally open...
Page 56: ...56 0 5 10 15 20 19 10 Maintenance EN IST BBZK 0721...
Page 57: ...57 1 14 a b c B M BBWK1 10 Maintenance EN IST BBZK 0721 B Assembly of the BBWK1...
Page 58: ...58 1 2 3 122 15 54 4 2 b b b b 10 Maintenance EN IST BBZK 0721...
Page 59: ...59 1 5 50 120 6 7 2 14 8 238 238 128 128 23 238 128 2 b b b b 10 Maintenance EN IST BBZK 0721...
Page 60: ...60 9 10 11 50 b b b 10 Maintenance EN IST BBZK 0721...
Page 61: ...61 12 13 b b 1 10 Maintenance EN IST BBZK 0721...
Page 62: ...62 33 1 2 2 14 15 b1 b1 10 Maintenance EN IST BBZK 0721 Normally closed...
Page 63: ...63 14 b2 33 2 10 Maintenance EN IST BBZK 0721 Normally open...
Page 64: ...64 0 5 10 15 20 16 10 Maintenance EN IST BBZK 0721...
Page 68: ...68 3 4 a a 1 10 Maintenance EN IST BBZK 0721...
Page 69: ...69 30 5 6 a a 10 Maintenance EN IST BBZK 0721...
Page 72: ...72 8 7 42 50 33 42 108 30 9 10 14 14 10 Maintenance EN IST BBZK 0721...
Page 74: ...74 19 18 17 54 122 15 24 10 Maintenance EN IST BBZK 0721...
Page 76: ...76 1 2 3 122 15 54 4 2 10 Maintenance EN IST BBZK 0721...
Page 79: ...79 13 42 108 14 15 14 14 42 50 33 2 10 Maintenance EN IST BBZK 0721...
Page 80: ...80 16 17 a a 30 10 Maintenance EN IST BBZK 0721 Normally closed...
Page 82: ...82 20 a 10 Maintenance EN IST BBZK 0721...
Page 84: ...84 18 19 b b 1 10 Maintenance EN IST BBZK 0721...
Page 85: ...85 20 b 2 10 Maintenance EN IST BBZK 0721...
Page 86: ...86 21 0 5 10 15 20 10 Maintenance EN IST BBZK 0721...
Page 88: ...88 A M BBZK 12 2D diagram BBZK EN IST BBZK 0721 122D diagram BBZK...
Page 89: ...89 A M BBZK 13 2D diagram BBYK EN IST BBZK 0721 132D diagram BBYK...
Page 90: ...90 B M BBWK1 14 2D diagram BBWK EN IST BBZK 0721 142D diagram BBWK...
Page 91: ...91 A M BBZK LL 15 2D diagram BBZK Diverter EN IST BBZK 0721 152D diagram BBZK Diverter...
Page 92: ...92 A M BBZK LL 16 2D diagram BBYK Diverter EN IST BBZK 0721 162D diagram BBYK Diverter...