
(GB-IST-BBZS5-0413) 8/22
BARDIANI VALVOLE reserves the right to modify without notice its products, including products already ordered.
8. General Maintenance
9. Planned Maintenance
3. CLEANING OF DEPOSITS
- Wash and clean all valve parts thoroughly before disassembly and
assembly!
- Pay attention to possible deposits of cleaning agents and other ag-
gressive fluids!
- Always use protective goggles and gloves, if necessary.
Wash and
clean!
4. REPLACING WORN VALVE
PARTS:
- Always use original pare parts.
- See page 9 for spare parts ordering.
Planned maintenance
Valve gaskets
Preventive
Replace after 12 months
In case of leak
Replace at the end of the day
Periodical
Check for proper operation and make sure
there are no leaks
Record all actions
1. PRESSURISED VALVE/PIPING:
- Always release fluid pressure from valve and piping
before disassembling the valve.
2. HOT VALVE/PIPING:
- Never touch hot valve or piping, if possible.
- Alternatively use protective gloves.
RISK of scalding