![Bardiani Valvole BBZPM Instruction Manual Download Page 4](http://html1.mh-extra.com/html/bardiani-valvole/bbzpm/bbzpm_instruction-manual_3864927004.webp)
B
A
(GB-IST-BBZPM-0413) 4/25
“BARDIANI reserves the right to modify without notice its products, including products already ordered”.
ATTENTION !
1. UNPACK AND CHECK VALVE DELIVERY:
A. Complete valve
B. Instruction manual
2. IDENTIFY VALVE TYPE SUPPLIED:
BBZPM: Pneumatic modulating valve
BBZPM: Pneumatic modulating valve divert
5. PACKING MATERIAL:
- Inspect internal of valve.
- Remove material and dispose of
according to current directives.
6. INSPECTION/CLAIM:
- Inspect valve connections.
- Document /verify damage,
missing or wrong parts.
- Use current claim procedure
if necessary.
7. STORAGE/PROTECTION:
-
Avoid dust, humidity, wet areas,
heat and similar.
-
Avoid vibration.
-
Min.: - 10 °C
-
Max.: + 50 °C
3. LIFTING OF HEAVY VALVE:
- Use lifting tool, if necessary.
- Fix valve to lifting tool.
3.Receiving/Unpacking/Storage
-
Opening
-
Air connections
-
Electrical connections
(for positioner GEMU)
Paking
material
Safe valve
protection!
BBZPM
BBZPM
DIVERT
4. HANDLING OF LOOSE VALVE PARTS:
- Avoid falling loose valve parts.
- Assemble and tighten loose parts.