
3
Technical data
9
EN-IST-BBZO-0420
3 Technical data
VALVE DATA
Maximum pressure
PN10
Maximum seal pressure
See catalogue
Storage temperature
from -10°C to 25°C
Material in contact with the product
AISI 316L (1.4404). Check the resistance to corrosion in
relation to products and detergents
Gasket material in contact with the
product
EPDM, FKM, HNBR and other gaskets on request. Check
compatibility with products and detergents
Surface finish in contact with the
product
Ra 0.8 µm. Other finishes available on request
PNEUMATIC ACTUATOR DATA
Connectors
1/8” BSP
Pipe dimensions
6 mm external diameter, 4 mm internal diameter
Air pressure
from 6 bar (87 psi) to 8 bar (116 psi)
Air quality
Class 2, 4, 3 ISO8573-1
External material
AISI 304L (1.4307)
Seals
NBR
Noise levels
76 dB
Electrical supply
See Giotto Top
GASKET MATERIALS COMPATIBILITY
Product
EPDM
FKM
HNBR
MVQ
Temperature (applications with air)
from -10°C
to +140°C
from -10°C to
+200°C
from -10°C to
+130°C
from -70°C to
+230°C
Caustic soda 2%
60°C
30°C
To be checked Unsuitable
Nitric Acid 2%
60°C
80°C
To be checked Unsuitable
Saturated steam 125°C
Suitable
To be
checked
Suitable
Unsuitable
Greases
Unsuitable
Suitable
Suitable
Unsuitable
Alcohols
Suitable
Unsuitable
Suitable
Suitable
The valve complies with PED 2014/68/EU directive, with special reference to Annex III, Module A,
concerning internal manufacturing checks as indicated in the Conformity Assessment Procedures.
Valves with DN equal or smaller than DN25 are not included in compliance with Article 4, paragraph 3.
Valves designed for use with gases, liquefied gases, gases dissolved under pressure, vapours and also those liquids
whose vapour pressure at the maximum allowable temperature is greater than 0,5 bar above normal atmospheric
pressure (1 013 mbar) are included within the following limits:
- valves with DN between DN32 and DN100 (included) with group 1 fluids;
- valves with DN125 or bigger with group 2 fluids.
In the event of any doubt, please contact Bardiani Valvole S.p.A.
Summary of Contents for BBZO
Page 2: ...2 EN IST BBZO 0420 MANUAL REVISION DATE...
Page 27: ...13 DisassemblyoftheBBZO BBZOG BBZOH BBZOR 27 EN IST BBZO 0420 1 50 33 3 b 2 b 2...
Page 35: ...14 AssemblyoftheBBZO BBZOG BBZOH BBZOR 35 EN IST BBZO 0420 50 2 11 a 12 a 1...
Page 36: ...14 AssemblyoftheBBZO BBZOG BBZOH BBZOR 36 EN IST BBZO 0420 2 13 a 33...
Page 37: ...14 AssemblyoftheBBZO BBZOG BBZOH BBZOR 37 EN IST BBZO 0420 1 191 1 50 33 2 11 b 12 b...
Page 38: ...14 AssemblyoftheBBZO BBZOG BBZOH BBZOR 38 EN IST BBZO 0420 13 b 2...
Page 39: ...14 AssemblyoftheBBZO BBZOG BBZOH BBZOR 39 EN IST BBZO 0420 2 33 100 14 b 15 b...
Page 42: ...15 Disassembly of the BBWO1 BBWOG1 42 EN IST BBZO 0420 3 b 2 b 2 1 50 33...
Page 43: ...15 Disassembly of the BBWO1 BBWOG1 43 EN IST BBZO 0420 1 191 4 b 5 b 6 b 2 14 2 7 b 23 238 128...
Page 44: ...15 Disassembly of the BBWO1 BBWOG1 44 EN IST BBZO 0420 35 34 8 9 10 286 120 50...
Page 50: ...16 Assembly of the BBWO1 BBWOG1 50 EN IST BBZO 0420 9 a 2 10 a 11 a 286 286...
Page 52: ...16 Assembly of the BBWO1 BBWOG1 52 EN IST BBZO 0420 9 10 b b 1 191 286 1 50 33 2...
Page 53: ...16 Assembly of the BBWO1 BBWOG1 53 EN IST BBZO 0420 11 12 b b 2 33 100...
Page 55: ...18 2D diagram BBZO 55 EN IST BBZO 0420 182D diagram BBZO 22 PTFE Execution 22...
Page 56: ...19 2D diagram BBZOG 56 EN IST BBZO 0420 192D diagram BBZOG 22 PTFE Execution 22...
Page 57: ...20 2D diagram BBZOH 57 EN IST BBZO 0420 202D diagram BBZOH 22 PTFE Execution 22...
Page 58: ...21 2D diagram BBZOR 58 EN IST BBZO 0420 212D diagram BBZOR 22 PTFE Execution 22...
Page 59: ...22 2D diagram BBWO1 59 EN IST BBZO 0420 222D diagram BBWO1 40...
Page 60: ...23 2D diagram BBWOG1 60 EN IST BBZO 0420 232D diagram BBWOG1 40...
Page 63: ...25 Recommendations 63 EN IST BBZO 0420 NOTES...