![Bardiani Valvole BBZK Operating And Maintenance Instructions Manual Download Page 11](http://html2.mh-extra.com/html/bardiani-valvole/bbzk/bbzk_operating-and-maintenance-instructions-manual_3842211011.webp)
BARDIANI VALVOLE reserves the right to modify without notice its products, including products already ordered.
(GB-IST-BBZK-0910) 11/26
Wash and clean
thoroughly!
6. CLEANING OF DEPOSITS
- Wash and clean all valve parts thoroughly before disassembly.
- Pay attention to possible deposits of cleaning agents or other ggressive fluids.
- Always use protective gloves and goggles, if necessary.
8. General Maintenance
9. Planned Maintenance
Planned maintenance
Valve gaskets
Pneumatic actuator gaskets
Preventive
Replace after 12 months
Replace after 24 months
In case of leaks
Replace at the end of the day
Replace in case of leakage
Periodical
Check for correct operation and ab-
sence of leaks
Check for correct operation and
absence of leak
Record all actions
Record all actions
7. REPLACING THE WORN PARTS OF THE VALVE:
- Always use original spare parts.
- See page 12 to order spare parts.