10
3
Technical data
EN-IST-BBZK-0821
3 Technical data
VALVE DATA
Maximum pressure
10 bar
Storage temperature
From -10°C to +25-C
Servo-control pressure range
3 - 15 psi (0.21 - 1.05 bar)
6 - 18 psi (0.42 - 1.25 bar)
6 - 30 psi (0.42 - 2.07 bar)
9 - 32 psi (0.62 - 2.21 bar)
Material in contact with the product
AISI 316L (1.4404). Check the resistance to corrosion in
relation to products and detergents
Gasket material in contact with the
product
EPDM, FKM, HNBR, P.T.F.E. and other gaskets on request.
Check compatibility with products and detergents
Surface finish in contact with the
product
Ra 0.8 µm. Other finishes available on request
Pneumatic actuator stroke
15 - 20 mm
VAPOUR BARRIER DATA
Connectors
1/8” BSP
Steam maximum temperature
130°C
Seals
FKM
GASKET MATERIALS COMPATIBILITY
Product
EPDM
FKM
HNBR
MVQ
Temperature (applications with air)
From -10 to
+140°C
From -10 to
+200°C
From -10 to
+130°C
From -70 to
+230°C
Caustic soda 2% *
60°C
30°C
To be checked Unsuitable
Nitric Acid 2% *
60°C
80°C
To be checked Unsuitable
Saturated steam 125°C
Suitable
To be checked Suitable
Unsuitable
Greases
Unsuitable
Suitable
Suitable
Unsuitable
Alcohols
Suitable
Unsuitable
Suitable
Suitable
The valve is in conformity with PED 2014/68/EU, with special reference to Annex III,
Form A, concerning internal manufacturing checks as indicated in the Conformity
Assessment Procedures.
The valves with DN equal or lower than DN25 are not included in compliance with Article 4, paragraph 3.
Valves designed for use with gas, liquid gas, gases dissolved under pressure, steam and those liquids with a vapour
pressure at maximum admissible temperature exceeding 0.5 bar at normal atmospheric pressure (1.013 mbar) are
included within the following limits:
- The valves with DN ranging from 32 to 100 (included) with Group 1 fluids;
- The valves with DN equal or higher than DN125 with Group 2 fluids.
The end user must carry out noise assessment testing once the
valve has been installed in the plant.
In the event of any doubt, please contact Bardiani Valvole S.p.A.
Summary of Contents for BBWK1
Page 2: ...2 EN IST BBZK 0821 MANUAL REVISION DATE...
Page 32: ...32 10 Maintenance EN IST BBZK 0821 10 3 Tools useful for Disassembly Reassembly TOOLS Soft...
Page 37: ...37 3 1 a1 10 Maintenance EN IST BBZK 0821...
Page 38: ...38 1 33 1 a2 10 Maintenance EN IST BBZK 0821 Normally open...
Page 39: ...39 4 5 2 2 14 6 7 2 33 10 Maintenance EN IST BBZK 0821...
Page 41: ...41 16 15 14 54 122 15 24 10 Maintenance EN IST BBZK 0821...
Page 43: ...43 3 4 b1 b1 1 10 Maintenance EN IST BBZK 0821...
Page 44: ...44 1 33 1 2 b2 b2 10 Maintenance EN IST BBZK 0821 Normally open...
Page 45: ...45 3 b2 1 2 10 Maintenance EN IST BBZK 0821...
Page 46: ...46 23 238 128 2 5 6 7 8 50 120 2 2 14 10 Maintenance EN IST BBZK 0821...
Page 47: ...47 11 10 9 54 122 15 24 10 Maintenance EN IST BBZK 0821...
Page 48: ...48 A B A M BBZK B M BBWK1 10 Maintenance EN IST BBZK 0821 10 6 Assembly of the BBZK BBYK BBWK1...
Page 49: ...49 1 14 a b c A M BBZK 10 Maintenance EN IST BBZK 0821 A Assembly of the BBZK BBYK...
Page 50: ...50 1 2 3 122 15 54 4 2 10 Maintenance EN IST BBZK 0821...
Page 53: ...53 2 14 2 50 13 14 15 10 Maintenance EN IST BBZK 0821...
Page 54: ...54 1 33 1 2 3 2 16 17 18 a1 a1 a1 10 Maintenance EN IST BBZK 0821 Normally closed...
Page 55: ...55 1 33 2 16 a2 10 Maintenance EN IST BBZK 0821 Normally open...
Page 56: ...56 0 5 10 15 20 19 10 Maintenance EN IST BBZK 0821...
Page 57: ...57 1 14 a b c B M BBWK1 10 Maintenance EN IST BBZK 0821 B Assembly of the BBWK1...
Page 58: ...58 1 2 3 122 15 54 4 2 b b b b 10 Maintenance EN IST BBZK 0821...
Page 59: ...59 1 5 50 120 6 7 2 14 8 238 238 128 128 23 238 128 2 b b b b 10 Maintenance EN IST BBZK 0821...
Page 60: ...60 9 10 11 50 b b b 10 Maintenance EN IST BBZK 0821...
Page 61: ...61 12 13 b b 1 10 Maintenance EN IST BBZK 0821...
Page 62: ...62 33 1 2 2 14 15 b1 b1 10 Maintenance EN IST BBZK 0821 Normally closed...
Page 63: ...63 14 b2 33 2 10 Maintenance EN IST BBZK 0821 Normally open...
Page 64: ...64 0 5 10 15 20 16 10 Maintenance EN IST BBZK 0821...
Page 68: ...68 3 4 a a 1 10 Maintenance EN IST BBZK 0821...
Page 69: ...69 30 5 6 a a 10 Maintenance EN IST BBZK 0821...
Page 72: ...72 8 7 42 50 33 42 108 30 9 10 14 14 10 Maintenance EN IST BBZK 0821...
Page 74: ...74 19 18 17 54 122 15 24 10 Maintenance EN IST BBZK 0821...
Page 76: ...76 1 2 3 122 15 54 4 2 10 Maintenance EN IST BBZK 0821...
Page 79: ...79 13 42 108 14 15 14 14 42 50 33 2 10 Maintenance EN IST BBZK 0821...
Page 80: ...80 16 17 a a 30 10 Maintenance EN IST BBZK 0821 Normally closed...
Page 82: ...82 20 a 10 Maintenance EN IST BBZK 0821...
Page 84: ...84 18 19 b b 1 10 Maintenance EN IST BBZK 0821...
Page 85: ...85 20 b 2 10 Maintenance EN IST BBZK 0821...
Page 86: ...86 21 0 5 10 15 20 10 Maintenance EN IST BBZK 0821...
Page 88: ...88 A M BBZK 12 2D diagram BBZK EN IST BBZK 0821 12 2D diagram BBZK...
Page 89: ...89 A M BBZK 13 2D diagram BBYK EN IST BBZK 0821 13 2D diagram BBYK...
Page 90: ...90 B M BBWK1 14 2D diagram BBWK1 EN IST BBZK 0821 14 2D diagram BBWK1...
Page 91: ...91 A M BBZK LL 15 2D diagram BBZK Diverter EN IST BBZK 0821 15 2D diagram BBZK Diverter...
Page 92: ...92 A M BBZK LL 16 2D diagram BBYK Diverter EN IST BBZK 0821 16 2D diagram BBYK Diverter...