CONTROL BOARD SEQUENCE of
OPERATION

The desuperheating control board will make a determination
whether or not to energize the pump relay inclusive on the
control board.

A. It will constantly monitor inputs from two temperature

sensors, Inlet & Outlet water sensors.

B. It will constantly monitor the Y signal.

C. Upon acknowledgment of Y signal, and following two

minutes, the control board will energize the pump relay.

D. After 1½ minutes, based on temperature difference

between Outlet & Inlet sensors, and the presence of Y
signal, the following will take place:

F

R

F

R

0

.

3

5

0

.

2

5

0

.

3

5

0

.

4

5

0

.

5

5

0

.

6

5

0

.

7

5

0

.

8

5

0

.

9

5

0

.

0

6

0

.

1

6

0

.

2

6

0

.

3

6

0

.

4

6

0

.

5

6

0

.

6

6

0

.

7

6

0

.

8

6

0

.

9

6

0

.

0

7

0

.

1

7

0

.

2

7

0

.

3

7

0

.

4

7

0

.

5

7

0

.

6

7

0

.

7

7

0

.

8

7

0

.

9

7

0

.

0

8

0

.

1

8

0

.

2

8

0

.

3

8

0

.

4

8

0

.

5

8

0

.

6

8

0

.

7

8

0

.

8

8

4

7

3

9

1

7

6

8

8

1

5

7

3

8

1

9

8

9

7

1

4

3

4

7

1

4

8

9

6

1

7

4

5

6

1

2

2

1

6

1

0

1

7

5

1

0

1

3

5

1

1

2

9

4

1

4

4

5

4

1

7

7

1

4

1

0

2

8

3

1

4

7

4

3

1

7

3

1

3

1

0

1

8

2

1

2

9

4

2

1

3

8

1

2

1

3

8

8

1

1

1

9

5

1

1

7

0

3

1

1

1

3

0

1

1

2

6

7

0

1

1

0

5

0

1

7

4

2

0

1

0

0

0

0

1

0

6

7

9

6

2

5

9

9

9

2

9

7

7

0

9

2

6

8

8

3

5

6

8

9

4

4

8

0

5

2

8

7

5

0

8

9

6

8

7

6

8

6

7

0

.

9

8

0

.

0

9

0

.

1

9

0

.

2

9

0

.

3

9

0

.

4

9

0

.

5

9

0

.

6

9

0

.

7

9

0

.

8

9

0

.

9

9

0

.

0

0

1

0

.

1

0

1

0

.

2

0

1

0

.

3

0

1

0

.

4

0

1

0

.

5

0

1

0

.

6

0

1

0

.

7

0

1

0

.

8

0

1

0

.

9

0

1

0

.

0

1

1

0

.

1

1

1

0

.

2

1

1

0

.

3

1

1

0

.

4

1

1

0

.

5

1

1

0

.

6

1

1

0

.

7

1

1

0

.

8

1

1

0

.

9

1

1

0

.

0

2

1

0

.

1

2

1

0

.

2

2

1

0

.

3

2

1

0

.

4

2

1

7

0

5

7

4

3

3

7

5

6

1

7

0

0

0

7

0

4

8

6

3

8

6

6

1

3

5

6

3

8

3

6

9

3

2

6

8

9

0

6

1

6

9

5

7

2

8

5

7

9

6

5

0

7

5

5

6

4

4

5

6

2

3

5

8

0

2

5

4

9

0

5

2

8

9

4

3

7

8

4

7

6

7

4

3

6

6

4

2

6

5

4

4

6

4

4

7

6

3

4

4

7

2

4

2

8

1

4

3

9

0

4

6

0

0

4

1

2

9

3

8

3

8

3

7

5

7

3

8

7

6

3

1

0

6

3

6

2

5

3

2

5

4

3

TEMPERATURE   F   vs   RESISTANCE   R   OF TEMPERATURE SENSOR

1.) If temperature difference is greater than 3°F, then

the control will continue to energize pump relay.

2.) If temperature difference is less than 3°F, then the

control will de-energize the pump relay.

3.) The control will next wait for 10 minutes before

repeating Step #1 (above).

E. The Over Temperature Limit Switch is placed in series

with the line voltage.  Therefore, continuity between L
of line voltage and L of pump output is forced broken
when the Over Temperature Limit Switch opens (see
Wiring Diagram).

F. The 3-amp fuse is put in series with the R connection to

the board.  Whenever the fuse is blown, the control will
lose power and consequently, the relay will disengage.

Figure 5

THERMISTOR

Summary of Contents for GVDM-26

Page 1: ...STIC HOT WATER DESUPERHEATER PUMP MODULE KIT Manual No 2100 517 Supersedes NEW File Volume I Tab 9 Date 02 06 09 Bard Manufacturing Company Inc Bryan Ohio 43506 Since 1914 Moving ahead just as planned...

Page 2: ...overy Unit 4 Start Up and Check Out 4 Maintenance 4 Control Board Sequence of Operation 10 COPYRIGHT FEBRUARY 2009 BARD MANUFACTURING COMPANY INC BRYAN OHIO USA 43506 WIRING DIAGRAM 5 FIGURES Figure 1...

Page 3: ...to the DSH COIL INLET and from DSH OUTLET tubes of the GVDM 26 Module Once soldering operations are complete and the tubes have cooled reattach the sensors and wrap with provided insulation INSTALLATI...

Page 4: ...logic these thermistors ensure there is at least 2 positive differential between entering leaving water temperatures and will shut down the pump accordingly START UP AND CHECK OUT Be sure all shut of...

Page 5: ...IT OUTLET INLET Y R C 24VAC L N CONTROL LOGIC NO C BLUE BLUE THERMISTOR BLUE BLUE THERMISTOR GREEN PUMP 4053 113 LOW VOLTAGE WIRING PUMP CONTROL HIGH VOLTAGE WALL PLUG RED FACTORY DESUPERHEATER TEMPER...

Page 6: ...anual 2100 517 Page 6 of 11 SUPPLIED WITH PUMP MODULE SCREWS INLET AND OUTLET TUBES ATTACH TO UNIT USING PROVIDED FILTER ASSEMBLY DESUPERHEATER PUMP MODULE MIS 2647 Figure 1 MOUNTING DIRECTLY ONTO UNI...

Page 7: ...LDERING THEN RE INSTALL NOTE PUMP IS NOT SELF PRIMING IT I S RECOMMENDED TO MANUALLY BLEED OFF NOTE INSTALLER MUST INSURE THAT THE INLET THERMISTOR IS RE LOCATED BACK TO THE INLET TUBE AND THE OUTLET...

Page 8: ...Manual 2100 517 Page 8 of 11 Figure 3 REMOTE MOUNTING PIPING...

Page 9: ...Manual 2100 517 Page 9 of 11 Figure 4 SINGLE TANK SYSTEM...

Page 10: ...9 4 4 8 0 5 2 8 7 5 0 8 9 6 8 7 6 8 6 7 0 9 8 0 0 9 0 1 9 0 2 9 0 3 9 0 4 9 0 5 9 0 6 9 0 7 9 0 8 9 0 9 9 0 0 0 1 0 1 0 1 0 2 0 1 0 3 0 1 0 4 0 1 0 5 0 1 0 6 0 1 0 7 0 1 0 8 0 1 0 9 0 1 0 0 1 1 0 1 1...

Page 11: ...B 2 1 7 1 2 0 4 8 t i m i L e r u t a r e p m e T r e t a W 3 1 7 3 3 1 1 t e k c a r B d r a o B l o r t n o C 4 4 1 1 1 0 2 8 d r a o B l o r t n o C r e t a e h r e p u s e D 5 5 4 0 4 1 6 8 t e l...

Reviews: