
Manual 7960-848B
Page
10 of 12
FIGURE 8
W12AB Freeze Stat Location and Wire Routing
MIS-4130
PART #8408-048
TO ADDRESS EXTRA WIRE LENGTH
TO EVAPORATOR COIL.
FREEZE STAT
TO ATTACH FREEZE STAT
USE BOTTOM DISTRIBUTOR TUBE
FREEZE STAT
NOTE: USE PUSH MOUNT CABLE TIE PART #7950-012
ON THE BOTTOM SIDE OF THE BLOWER PARTITION
FREEZE STAT PLACEMENT
WIRES RUN THROUGH
BUSHING AND INOT CONTROL
PANEL WITH THE BLOWER
MOTOER WIRES.