![Barco X8 Installation Manual Download Page 50](http://html.mh-extra.com/html/barco/x8/x8_installation-manual_473830050.webp)
7. Basic setup procedures
1
2
Image 7-6
6. Slide the retracted side pins (reference 1image 7-7) at the vertical adjoining edge into the locking mechanism of the neighboring
rental tile.
7. Fasten the two lock handles (reference 2image 7-7) at the vertical adjoining edge. Push the handle inwards and turn quarter turn
clockwise.
Caution:
Ensure that the side pins of the neighboring tile are captured by the locking handles!
8. Fasten the clamp at the vertical adjoining edge (reference 3image 7-7).
1
3
2
1
3
2
Image 7-7
46
R5905160 X8 RENTAL DISPLAY 25/02/2013
Summary of Contents for X8
Page 1: ...X8 Rental Display Installation manual R5905160 03 25 02 2013 ...
Page 14: ...1 Safety 10 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Page 42: ...6 Setup process of a X8 rental display 38 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Page 56: ...7 Basic setup procedures 52 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Page 62: ...8 Cabling of the X8 display 58 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Page 82: ...A Dimensions 78 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Page 86: ...B Specifications 82 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...
Page 94: ...D Product Green Compliance 90 R5905160 X8 RENTAL DISPLAY 25 02 2013 ...