5. Mechanical Installation
How to mount the safety cable ?
1. Pass the two extremities through the two holes (see image below). Pass the second cable as shown on the image. The cables
can now be attached to an appropriate, stable, fixed object (top part of the ceiling mount) once the assembly has been lifted at
its final position. (image 5-9)
Image 5-9
5.2.4
Fixation of the assembly
Safety precautions !
W
ARNING
:
Never stand under the lifted projector !
W
ARNING
:
Lifting of the projector has to be done slowly and by avoiding swaying !
W
ARNING
:
When lifting the assembly always take the necessary precautions !
W
ARNING
:
Persons not involved with the installation, must be kept out of the installation area !
How to lift and fix the assembly ?
1. While 2 persons pull on the cords and lift the projector, 2 other persons hold the assembly into position until the screwed rods
pass through the fixation holes on the lower supports. (image 5-10)
R5976989 BARCO VR WORKROOM 22/09/2006
21
Summary of Contents for VRWF-3200
Page 6: ......
Page 8: ...Table of contents 2 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 10: ...1 Safety 4 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 12: ...2 Introduction 6 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 16: ...3 Packaging 10 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 20: ...4 System overview 14 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 36: ...6 Fine adjustments 30 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 40: ...7 Connections 34 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 48: ...8 Setup 42 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 62: ...A The support table Image A 6 Image A 7 56 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 66: ...C Troubleshoot 60 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 68: ...Glossary 62 R5976989 BARCO VR WORKROOM 22 09 2006...
Page 70: ...Index 64 R5976989 BARCO VR WORKROOM 22 09 2006...