R5906788-03
Thor series
40
5
6
7
X2
Image 4-2
Caution:
Ensure that the pedestal is capable to carry the weight of the projector.
After unpacking, allow the projector to acclimatize to a room temperature ranging from 10°C (50°F)
to 30°C (86°F) MAX. Neglecting this may result in a start up failure of the Light Processor Unit.
4.3 Initial inspection
General
Before shipment, the projector was inspected and found to be free of mechanical and electrical defects. As
soon as the projector is unpacked, inspect for any damage that may have occurred in transit. Save all packing
material until the inspection is completed. If damage is found, file claim with carrier immediately. The Barco
Sales and Service office should be notified as soon as possible.
The packaging of the Thor series projector is provided with a
shock-watch
label. If this shock-
watch label was triggered (red colored at arrival) during transport may indicate rough handling by
the transport company. In this case, the instructions mentioned on the label, should be followed,
which are: adding a note on the
“
bill of lading
”
and informing the transport company and the Barco
sales and service office as soon as possible.
Box content
•
Projector.
•
User and installation manual (this document).
•
Safety manual.
The projector lens is not included in the package of the projector.
Mechanical check
This check should confirm that there are no broken knobs or connectors, that the cabinet and panel surfaces
are free of dents and scratches, and that the operating panel is not scratched or cracked. The Barco Sales
and Service office should be notified as soon as possible if this is not the case.
Summary of Contents for Thor Series
Page 1: ...ENABLING BRIGHT OUTCOMES Installation manual Thor series...
Page 2: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com en support www barco com...
Page 8: ...R5906788 03 Thor series 8...
Page 24: ...R5906788 03 Thor series 24 Safety Information...
Page 26: ...R5906788 03 Thor series 26 Commander Web Commander System overview...
Page 44: ...R5906788 03 Thor series 44 Installation process...
Page 68: ...R5906788 03 Thor series 68 Lenses Lens selection...
Page 78: ...R5906788 03 Thor series 78 Installing a HDD into the ICMP ICMP...
Page 110: ...R5906788 03 Thor series 110 Starting up...
Page 122: ...R5906788 03 Thor series 122 Scheimpflug...
Page 130: ...R5906788 03 Thor series 130 Convergence...
Page 142: ...R5906788 03 Thor series 142 Preventative maintenance actions...
Page 160: ...R5906788 03 Thor series 160 Specifications...
Page 168: ...R5906788 03 Thor series 168 Pin configurations...
Page 172: ...R5906788 03 Thor series 172 Environmental information...
Page 176: ...Glossary R5906788 03 Thor series 176...
Page 181: ...R5906788 03 Thor series 181...
Page 182: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com R5906788 03 07 09 2018...