4. Proper and safe use of the foot system
4.1
Folding out the foot system into the 80° stand
This procedure can be performed by one person.
W
ARNING
:
Preferably wear protective gloves for this operation.
How to fold out the foot system?
1. Fold out both feet, pulling the top of the pro
fi
le indicated in the illustration.
Warning:
Make sure you are positioned between the feet so you can not be hurt when the feet fall down!
PULL
PULL
Image 4-1
2. The feet are now positioned as illustrated below. Push the tile forward until the guiding pin has fallen into the
fi
rst groove of booth
feet.
Note:
The
fi
rst groove is indicated with the red circle.
Warning:
Do not push the tile further forward then necessary. Doing so can damage the shader and can trow you out off
balance.
Warning:
Always
fi
rmly hold the SP-20 tile with both hands.
26
R59770294 SP-20 11/02/2009
Summary of Contents for SP-20
Page 1: ...SP 20 Installation manual R59770294 02 11 02 2009 ...
Page 4: ......
Page 6: ...Table of contents 2 R59770294 SP 20 11 02 2009 ...
Page 33: ...4 Proper and safe use of the foot system 1 2 Image 4 5 R59770294 SP 20 11 02 2009 29 ...
Page 35: ...4 Proper and safe use of the foot system 1 CLICK 2 Image 4 7 R59770294 SP 20 11 02 2009 31 ...
Page 36: ...4 Proper and safe use of the foot system 32 R59770294 SP 20 11 02 2009 ...
Page 39: ...5 Physical installation 1 2 3 4 Image 5 2 R59770294 SP 20 11 02 2009 35 ...
Page 41: ...5 Physical installation Image 5 5 R59770294 SP 20 11 02 2009 37 ...
Page 42: ...5 Physical installation 38 R59770294 SP 20 11 02 2009 ...
Page 46: ...6 Cabling 42 R59770294 SP 20 11 02 2009 ...
Page 47: ...7 Maintenance 7 MAINTENANCE Overview Cleaning SP 20 tiles R59770294 SP 20 11 02 2009 43 ...
Page 49: ...8 Order info 8 ORDER INFO Overview Order info R59770294 SP 20 11 02 2009 45 ...
Page 51: ...A Dimensions A DIMENSIONS Overview Dimensions of the SP 20 tile R59770294 SP 20 11 02 2009 47 ...