11. Maintenance
11.6 Cooling liquid re
fi
ll
W
ARNING
:
This procedure may only be performed by quali
fi
ed technical service personnel.
Order info cooling liquid
B1909086K : bottle of 1 liter cooling liquid.
Necessary parts
Cooling liquid
How to re
fi
ll
1. Remove the side cover, see "Removal of the side cover", page 95.
2. Open the
fi
ller cap by turning it anti clockwise.
Max
Min
Image 11-6
Cooling liquid re
fi
ll
3. Fill the reservoir with cooling liquid until the level is equal with the
Max
indication on the reservoir.
4. Close the reservoir again. Turn the
fi
ller cap clockwise to close the reservoir.
5. Reinstall the side cover.
C
AUTION
:
Never
fi
ll above Max level mark !
R59770495 DP2K-23B 30/04/2010
111
Summary of Contents for DP2K-23B
Page 1: ...DP2K 23B Installation manual R59770495 00 30 04 2010...
Page 6: ......
Page 37: ...4 Lamp lamp house Image 4 5 Remove lamp house R59770495 DP2K 23B 30 04 2010 31...
Page 47: ...4 Lamp lamp house 4 Reinstall the lamp cover of the projector R59770495 DP2K 23B 30 04 2010 41...
Page 78: ...7 Communicator Touch Panel 72 R59770495 DP2K 23B 30 04 2010...
Page 82: ...8 Starting up 76 R59770495 DP2K 23B 30 04 2010...
Page 90: ...9 Projector registration Image 9 9 Add new owner 84 R59770495 DP2K 23B 30 04 2010...
Page 110: ...10 Removal and installation of the projector covers 104 R59770495 DP2K 23B 30 04 2010...