Date : 25/10/95 R9827990-1
Ceiling Mount CM50
R9827990
R9827991
13
Mounting Instructions
Configuration C
Insertion of the cord
Insert the cord as shown in next drawing.
Start cord insertion at the pulley (fix the
pulley to the cord using the two wire rope
clips) and continue as illustrated with the
arrows.
Mounting the cord support
First slide the pulley through the gap on the front
side of the upper support and push the pulley
through the circular gap in the upper support.
Slide the cord support through the gap on the front
side and secure the cord support with the two bolts
(M6).
Mounting the projector on the ceiling support
A
Supporting
axle
Bolt A
Pulley
cable
Coupling the pulley to the projector support
Push the pulley into the cone on the projector
support.
Run the bolt (M8x60) through the cone and over
the supporting axle and secure by turning the bolt
in the cone.
The system is ready to start lifting up the projector
Apply now all the mounting instruc-
tions as explained for the configura-
tion B (see page 10 and 11), except
....
(only the cord support is not present in the illustrations)