3. Installation
3.4
Lifting the
fi
rst part
What has to be done ?
LED wall is stored in 3 parts inside the trailer. One part has to be mounted on the other using the built-in lifting system.
Note about the hydraulic pump
When the pump is unused, it automatically stops after 3 to 5 minutes. A restart is necessary.
Execute the next steps
1. Insert the sequence pin.
Image 3-11
1
Sequence pin
2
Security pins (3x)
2. Start up the pump by pushing the black button.
(Pump is mounted on top of the generator)
Image 3-12
Pump system
3
Start button
4
Lifting handle
3. Lift up the wall until it is 20 cm above the second part.
Caution:
Be careful not to lift up too much otherwise the wall guide becomes loose from the mast.
R59770490 B-16 MOBILE LED 07/01/2010
27
Summary of Contents for B-16 Mobile LED
Page 1: ...B 16 Mobile LED Installation manual R9855516 R59770490 00 07 01 2010...
Page 4: ......
Page 6: ...Table of contents 2 R59770490 B 16 MOBILE LED 07 01 2010...
Page 22: ...2 System overview 18 R59770490 B 16 MOBILE LED 07 01 2010...
Page 38: ...3 Installation 34 R59770490 B 16 MOBILE LED 07 01 2010...
Page 48: ...4 Moving down the display 44 R59770490 B 16 MOBILE LED 07 01 2010...
Page 59: ...A Wind speeds A WIND SPEEDS R59770490 B 16 MOBILE LED 07 01 2010 55...
Page 60: ...A Wind speeds 56 R59770490 B 16 MOBILE LED 07 01 2010...
Page 62: ...A Wind speeds 58 R59770490 B 16 MOBILE LED 07 01 2010...
Page 63: ...B Dimensions B DIMENSIONS R59770490 B 16 MOBILE LED 07 01 2010 59...
Page 64: ...B Dimensions 60 R59770490 B 16 MOBILE LED 07 01 2010...