
15
Set Up
PATHFINDER SET UP
3.
Set up a stringline above the bore pit with the transit. On the proposed bore path. Instal stakes
at eather end deep enough to strech the string tight. Do this with the ability to have the sring
removed as equipment is set in the pit. You must be able to restrech the string, placing it back in
the same place.
NOTE! Make sure the string line is totally independent from the pit walls/ trench box etc.
Set Up
16
Summary of Contents for Pathfinder PF500
Page 1: ...Operation Manual PF500 REV 4 13 19...
Page 5: ...2 Safety...
Page 6: ...3 Safety...
Page 7: ...4 Component Description...
Page 8: ...Component Description 5...
Page 9: ...6 Component Description MINOR MACHINE COMPONENTS...
Page 10: ...DISCRIPTION OF MINOR MACHINE COMPONENTS Component Description 7...
Page 11: ...OPERATORS CONSOLE Component Description 8 A B C D E J F G I H...
Page 13: ...DOWNHOLE TOOLING AND PILOT ROD C A D E B I H G K J F L...
Page 16: ...SADDLE KIT Component Description 13...
Page 17: ...14 Set Up...
Page 21: ...7 8 Lock the Pathfinders dogs into the track by pulling the lever under each saddle...
Page 22: ...19 Set Up 9 10...
Page 23: ...Set Up 20 11 12...
Page 24: ...21 Set Up...
Page 41: ......