10.5.8
Remove the vermiculite panels
Only do this procedure after finish of the procedure in section
.
1.
Carefully put the end of a screwdriver
under a panel and lift it up.
2.
Remove the vermiculite panel.
3.
Do step 1. and 2. again for the other
vermiculite panels.
10.6
Installation of the interior of the combustion chamber
1.
Install the vermiculite panels. Refer to section
2.
Install the cast iron side panels. Refer to section
.
3.
Install the steel bottom plates. Refer to section
4.
Install the cast iron rear panels. Refer to section
5.
Install the grate. Refer to section
.
6.
Install the upper baffle. Refer to section
7.
Install the lower baffle. Refer to section
.
8.
Install the heat shield. Refer to section
10.6.1
Install the vermiculite panels
1.
Put the top of the vermiculite panel in
the U-shaped holder in the appliance.
(1)
2.
Move the vermiculite panel to a
vertical position. (2)
3.
Lower the vermiculite panel. (3)
4.
Repeat this procedure for the other
vermiculite panels.
1x
4x
1x
1x
1x
4x
Maintenance
Cuatro-7 75-60
47
Summary of Contents for Cuatro-7 75-60
Page 6: ...1 Declaration of performance Declaration of performance 6 Cuatro 7 75 60...
Page 56: ...11 2 Connections on Opti Air system Technical data 56 Cuatro 7 75 60...
Page 59: ...12 Dimensions 12 1 Cuatro 7 75 60 with built in frame Dimensions Cuatro 7 75 60 59...
Page 60: ...12 2 Cuatro 7 75 60 with built in frame and convection casing Dimensions 60 Cuatro 7 75 60...
Page 66: ...12 8 Cuatro 7 75 60 with classic frame Dimensions 66 Cuatro 7 75 60...
Page 67: ...12 9 Cuatro 7 75 60 with classic frame and convection casing Dimensions Cuatro 7 75 60 67...
Page 75: ...Warranty Terms Cuatro 7 75 60 75...
Page 76: ...Your Barbas dealer 001 28 06 2022 352574 271 001...