17
BOX 67
Installation instructions
3.4.2 Connecting to the chimney
Ceiling connection:
Insert a pipe into the sliding sleeve (niche pipe) to the ceiling as deep as possible.
Position a chimney pipe on the top plate and mark off where the top pipe should be
shortened.
Shorten the top pipe and insert it, once more, as deep as possible into the sliding sleeve
in the ceiling. Position the lower pipe over the sealing washer. Now pull the top pipe
down and over the bottom pipe.
Wall connection:
Determine the length of pipe required and push this as far as possible into the sliding
sleeve before the appliance is placed.
Once the appliance is placed, you can pull the pipe from the sliding sleeve and slide it
over the connection ring on the appliance.
Any seams in the fl ue gas outlet (pipes) joints should be
sealed with a heat-resistant kit that remains elastic or
with a glass-fi bre cord.
Summary of Contents for BOX 67
Page 2: ......
Page 6: ...6 BOX 67 Installation instructions...
Page 28: ...28 BOX 67 Installation instructions 7 DIMENSIONS 7 1 BOX 67...
Page 29: ...29 BOX 67 Installation instructions 7 2 BOX 67 WITH WOOD LOG STORAGE MODULE...
Page 33: ...33 BOX 67 Installation instructions...
Page 34: ...34 BOX 67 Installation instructions...
Page 35: ......