Barbarian Basketball Systems Titanium Series Assembly Instructions And Owner'S Manual Download Page 7

Attach Goal (I) to Backboard (H).

Remove the Rim box cover, put Goal
against Rim pad (Pre-installed), secure it
with 4 Hex bolts M10x55 (#11), 8 Flat
washers M10 (#12),  4 Flange nuts M10
(#13) See Figure 10.

Tighten all four bolts and nuts.

Put Rim box cover back and secure it with
removed screws.

9.

Figure 9

Figure 10

11 12

I

12 13

Attach Upper Extension arm (G)to
Pole (A),

using one Hex bolt M12x210 (#4), two
Flat washers M12 (#8), two Plastic
washers M12  (#1), and one Lock nut
M12 (#9). See

.

Figure 9

Note: The plastic washer should be placed
between Upper extension arm (G) and Pole
pivot tube (A).

6.

7.

Attach Backboard (H) to Lower Extension arm (F).

Turn crank to lower support frame (F) until against
safety stop.
With 3 capable adults, raise the Backboard assembly
up and connect Lower Extension arm (F) to the
Backboard Bracket using one Stud M12x265 (#2), 2
washers M12 (#8), 2 Plastic washers M12 (#1), and 2
Lock nuts M12 (#9).

Tighten this bolt snugly. See Figure 9.

Note:
1. Slide the Stud thru from outside of Vertical tubes. After
the stud is installed, plug end caps into the holes on the
vertical frame, to keep bees from holes.  4pcs plugs can be
found in the hardware pack or manual pack.
2. The plastic washer goes between backboard bracket (H)

Attach Backboard (H) to Upper
Extension arm (G).

Connect Upper board arm (G) to the
Backboard edge using 2 Hex bolts M12x55
(#6), 4 Flat washers M12 (#8), 2 Plastic
washers M12 (#1), and two Lock nuts M12
(#9).

Tighten the two bolts and nuts snugly.

See Figure 9.

8.

7

6

8

8

9

1

9

8

1

8

6

H

G

G

8

9

4

8

1

8

9

A

8

9

2

1

F

STEP 8

STEP 6

safety stop

STEP 7

Summary of Contents for Titanium Series

Page 1: ...COMPLY WITH ANY OF THE WARNINGS IN THESE INSTRUCTIONS MAY RESULT IN SERIOUS PERSONAL INJURY FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE PLEASE HEED ALL WARNINGS AND CAUTIONS TO ENSURE YOUR S...

Page 2: ...ity Repair before each use Never play on damaged equipment Wear a mouthguard when playing to avoid dental injuries FAILURE TO FOLLOW THESE WARNINGS MAY RESULT IN SERIOUS INJURY AND OR PROPERTY DAMAGE...

Page 3: ...M12x105mm K 1 Rim Pad Pre attached 6 2 Hex bolt M12x55 L 1 Crank 7 2 Hex Bolt M12x35mm 8 20 Flat washer M12 U1 1 Anchor Template 9 11 Nylon nut M12 U2 4 16mm Anchor J bolts 10 1 Steel Sleeve U3 8 Thi...

Page 4: ...ottom of threads on J bolt U2 insert threads of J bolt U2 through hole on anchor plate U1 and secure with nut U4 Note Each leg of anchor bolts should face the anchor bolt to the right See Figure 2 Mix...

Page 5: ...re 4 If the Main Post A is not exactly vertical adjust the 16mm J Bolt Hex Nuts U4 located under the Post base A Tighten all of the Hex Nuts U4 Above Post base when Main Post A is vertical NOTE Face t...

Page 6: ...re 8 Hold the Actuator assembly align Steel Sleeve with the Rear hole of Lower extension Arm F Attached them together with one Hex bolt M12x240 3 two Flat washers M12 8 and one Lock nut M12 9 Attached...

Page 7: ...safety stop With 3 capable adults raise the Backboard assembly up and connect Lower Extension arm F to the Backboard Bracket using one Stud M12x265 2 2 washers M12 8 2 Plastic washers M12 1 and 2 Loc...

Page 8: ...t bottom edge of Actuator Sleeve C Crank the rim all the way down to the extreme end Peel and apply Rim Height sticker to outside of Actuator B lining up the mark with the 10 mark on the Rim Height St...

Reviews: