Baoding Longer Precision Pump WT3000-1FB Operating Manual Download Page 9

Pump Head Operation

Pump Head Installation:

The pump head is mounted on drive before the pump leaves the factory.
Follow below procedure for changing another pump head.

1.Loose the three M3 screws which connect the pump head and the pump

head bracket. Dismantle the pump head slightly.

2.Put the new pump head in the old pump head location. Pay attention to

the inlet and outlet locations of the pump head. Use three M3 screws to
connect the pump head and the pump head bracket.

Turn off the power supply before changing the pump head.

Pump Heads and Flow rates

85.7~857.1

171.4~1714.3

257.1~2571.4

MS(MG)204

MS(MG)209

MS(MG)213

Acceptable

Pump Heads

Flow Rates

(mL/min)

0

00(rpm)

30

30

~

Part Number

05015010001

05015010002

05015010003

MG

MS

(

)

Strong Magnet

05015010011

05015010012

05015010013

Pump Head Setting

Press the

to highlight Pump Head line, press

again to enter pump

head selection interface, turn

to select the pump head, press the

for confirmation and return to previous menu, or press

not to store

the selection and return to previous menu.

Knob

Knob

Knob

Knob

Exit Key

Flow Mode Operation

Enter Flow Mode

Press and turn the

to highlight control mode line. Press

to enter

next interface, turn

to select control mode, press

for confirmation.

Press

not to store the selection and return to previous menu.

Knob

Knob

Knob

Knob

Exit Key

Flow Control:

Turn the

to adjust the flow rates.

Knob

Flow Calibration

Press and turn

to highlight calibration line. Press

to enter next

interface. Turn

to select

. Press

to highlight test time

line. Press

again to highlight the value of time. Turn

to select

test time (its range is from 30 to 1800 seconds), press

for

confirmation. Press

not to store the selection and return to

previous menu.
Press

, the LCD displays running time and actual volume. Running

time counts down. Turn

to input actual test volume. Press

for

confirmation. The calibration operation can be repeated.

Knob

Knob

Knob

Flowrate

Knob

Knob

Knob

Knob

Exit Key

Run Key

Knob

Knob

5

6

Micro Gear Pump Drive Operating Manual

Micro Gear Pump Drive Operating Manual

If the actual volume is known in advance, enter the calibration interface and
input the actual volume directly.

Summary of Contents for WT3000-1FB

Page 1: ...icro Gear Pump Drive F Operating Manual Baoding Longer Precision Pump Co Ltd Building A Chuangye Center Baoding National High Tech Industrial Development Zone Baoding Hebei China 071051 TEL 86 312 311...

Page 2: ...ower line when pulling out Please shut down the power supply and pull out the plug when you think the pump needs to be maintained or repaired Shut down the power supply of the pump when connecting to...

Page 3: ...ower line when pulling out Please shut down the power supply and pull out the plug when you think the pump needs to be maintained or repaired Shut down the power supply of the pump when connecting to...

Page 4: ...uns or stops or in dispensing mode the pump stops press the to enter prime state when the pump runs at full speed for empting filling and rinsing operation Press the again to return to common state In...

Page 5: ...uns or stops or in dispensing mode the pump stops press the to enter prime state when the pump runs at full speed for empting filling and rinsing operation Press the again to return to common state In...

Page 6: ...ng direction Indicate the direction of the pump The running direction of the pump can t be changed d Running status means the pump runs means the pump stops means the pump is in prime state e Control...

Page 7: ...ng direction Indicate the direction of the pump The running direction of the pump can t be changed d Running status means the pump runs means the pump stops means the pump is in prime state e Control...

Page 8: ...r press not to store the selection and return to previous menu Knob Knob Knob Knob Exit Key Flow Mode Operation Enter Flow Mode Press and turn the to highlight control mode line Press to enter next in...

Page 9: ...r press not to store the selection and return to previous menu Knob Knob Knob Knob Exit Key Flow Mode Operation Enter Flow Mode Press and turn the to highlight control mode line Press to enter next in...

Page 10: ...hlight copy number line Press to enter next interface Turn to select copy number press for confirmation Press not to store the selection and return to previous menu If the copy no is 0 the dispensing...

Page 11: ...hlight copy number line Press to enter next interface Turn to select copy number press for confirmation Press not to store the selection and return to previous menu If the copy no is 0 the dispensing...

Page 12: ...0 5 5 V 1 0 1 0 10kHz External Control Mode DB15 Plug Analog Control Communication Control R 485 S 1 Enable the external control function 2 These five Standard Analog Control Module need to be order s...

Page 13: ...0 5 5 V 1 0 1 0 10kHz External Control Mode DB15 Plug Analog Control Communication Control R 485 S 1 Enable the external control function 2 These five Standard Analog Control Module need to be order s...

Page 14: ...n and return to previous menu The pump identifies the Longer Footswitch automatically When the pump connects the footswitch the on operating panel is invalid no matter the external control setting is...

Page 15: ...n and return to previous menu The pump identifies the Longer Footswitch automatically When the pump connects the footswitch the on operating panel is invalid no matter the external control setting is...

Page 16: ...rol Output Communication Flow rates Function Dispensing Function Memory Function Calibration Cooling Mode Direction MG204 MG209 M 213 Membrane keypad and Knob Full speed for fast filling and emptying...

Page 17: ...rol Output Communication Flow rates Function Dispensing Function Memory Function Calibration Cooling Mode Direction MG204 MG209 M 213 Membrane keypad and Knob Full speed for fast filling and emptying...

Page 18: ...icro Gear Pump Drive F Operating Manual Baoding Longer Precision Pump Co Ltd Building A Chuangye Center Baoding National High Tech Industrial Development Zone Baoding Hebei China 071051 TEL 86 312 311...

Reviews: