8/18
Designed for care
Step 2:
Raise the cistern to the top position and secure to the wall with appropriate screws for the wall. Bano
recommends M8 A4 DIN571 Hex head wood screws.. For concrete Bano recommends French wood screws
M6 in combination with a nylon plug.
Fixing to wall
Make sure never to perforate wet walls completely. Clean the holes after drilling. Make sure to use sealant
approved for application on wet walls. See
illustration.
Please note that the product guarantee only applies when the wall and screws are dimensioned
according to «Byggebransjens Våtromsnorm» and Bano interface for products mounted in Norway. For
products mounted in other countries, please note that the product guarantee only applies when wall and screws
are dimensioned according to national guidelines/regulations and Bano interface.
Tiled wooden wall:
Make sure never to perforate wet walls completely. Drill holes with a 10 mm drill bit through the tiles only. Clean
and fill the hole with sealant approved for application on wet walls. See
i
llustration.
Tiled concrete wall:
Drill holes using a 12 mm drill bit through the tiles only. Switch to a 10 mm drill bit for further drilling through the
concrete. Fill the hole with sealant, place a nylon plug in the hole and fill the plug with sealant. See
illustration.
Other wall materials (bathroom boards, vinyl):
Make sure never to perforate wet walls completely. Drill holes which are dimentioned for said type of wall. Fill
the hole with sealant, place a nylon plug in the hole and fill the plug with sealant. See
illustration.
MOUNTING IN WOOD WALL
MOUNTING IN CONCRETE WALL
Flis /
Tile
Treverk /
Wood
Betong /
Concrete
Gips /
drywall
Membran/
Membrane
Silikon/
Silicone
Gips
Betong
Trä
Kakel
Step 1:
Lower the cistern to the bottom position and secure to the wall with appropriate screws for the wall. Bano
recommends M8 A4 DIN571 Hex head wood screws. For concrete Bano recommends French wood screws
M6 in combination with a nylon plug.