![Bano 5970S2-EL Installation Instructions Manual Download Page 9](http://html1.mh-extra.com/html/bano/5970s2-el/5970s2-el_installation-instructions-manual_3714242009.webp)
(9/17)
Fixing to wall:
Make sure never to perforate wet walls completely. Clean the holes after drilling. Make sure to use
sealant approved for application on wet walls.
See illustration.
Please note that the product guarantee only applies when the wall and screws are dimensioned
according to «Byggebransjens Våtromsnorm» and Bano interface for products mounted in Norway.
For products mounted in other countries, please note that the product guarantee only applies when
wall and screws are dimensioned according to national guidelines/regulations and Bano interface.
Tiled wooden wall:
Make sure never to perforate wet walls completely. Drill holes with a 10 mm drill bit through the tiles
only. Clean and fill the hole with sealant approved for application on wet walls.
Se illustration.
Tiled concrete wall:
Drill holes using a 12 mm drill bit through the tiles only. Switch to a 10 mm drill bit for further drilling
through the concrete. Fill the hole with sealant, place a nylon plug in the hole and fill the plug with
sealant.
Se illustration.
Other wall materials (bathroom boards, vinyl):
Make sure never to perforate wet walls completely. Drill holes which are dimentioned for said type
of wall. Fill the hole with sealant, place a nylon plug in the hole and fill the plug with sealant.
See illustration.
Drill holes and fix the frame to the wall. Make sure the screws are fastened withing the nailing strips,
see Bano interface page 5.
FIXING WOODEN WALL
FIXING CONCRETE WALL
Plaster walls
Concret
Wood
Tiles