7/19
Designed for care
Preparation before assembling
2
1
Drain in the floor, reinforcements,
hidden pipes
Installing flexible WC-pipe
NB! Flush the pipes for 30 seconds before you install the cistern.
Drainage in the wall,
reinforcements, hidden pipes