How to service
Front line service
Both the Master and the Socket Unit has been developed for simple module
exchange to follow the on-site service strategy. Module exchange is possible on-site,
at the dealer or in the service workshop whatever is most convenient in each case.
For on-site service a back-up suitcase must be used.
Module exchange is the recommended way to perform service, due to the fact
that most of the modules are multi layer based, and most of the circuits are on a
single main PCB.
An electrical fault symptom can be removed during one visit to the customers
home if you bring a BeoCenter 2 back-up suitcase with you.
Is it a mechanical symptom, the particular part must be brought with you
separately.
The Socket Unit and the Master Unit must be connected when testing, because
the Socket Unit contains the power supply.
Service documentation
Service documentation for BeoCenter 2 will be a Service Manual with part nos. for
the back-up suitcase, electrical and mechanical parts, user’s guides etc.
1.2 How to service
Summary of Contents for BeoCenter 2 MK II
Page 10: ...2 ...
Page 22: ...3 12 ...
Page 24: ...4 ...
Page 43: ...Servicetest position 5 19 5 3 BeoCenter 2 in service position Placement of magnetic tester ...
Page 54: ...6 ...
Page 55: ...7 1 Overall block diagram Overall block diagram 7 1 7 1 ...
Page 56: ...7 2 7 2 7 2 ...
Page 67: ......
Page 68: ...Bang Olufsen DK 7600 Struer Denmark Phone 45 96 84 11 22 Fax 45 97 85 39 11 3538050 11 06 ...