installation
TOP
3fd
(remote digital repeater)
Installation
When installing the
3fd display, ensure correct
orientation with the connector block on the left-hand
side when the unit is viewed from the rear.
Note: If the Unit is to be Mast-mounted, a grommet
must be fitted to prevent the FastNet
2
cable from
chaffing on the surrounding structure.
panel mounting
A hole must be cut in the panel using the template
supplied. Peel the protective backing from the
adhesive surface of the sealing gasket and fit the
gasket in position. Locate the
3fd display unit into the
hole you have cut, place the four screws in the fixing
holes and tighten. Clip on the snap-on bezel with the
arrow (on the rear face of bezel), pointing upwards.
Note:
The sealing gasket should be placed between
the display and bulkhead to prevent moisture
penetration and reduce the effects of any vibration
transmitted through the instrument panel.
www.bandgservice.co.uk
+44 (0)1590 689699
Summary of Contents for 3fd
Page 7: ...3fd 3 function display deutsch www bandgservice co uk 44 0 1590 689699...
Page 12: ...3fd 3 function display espa ol www bandgservice co uk 44 0 1590 689699...
Page 17: ...3fd 3 function display fran ais www bandgservice co uk 44 0 1590 689699...
Page 22: ...3fd 3 function display italiano www bandgservice co uk 44 0 1590 689699...