Grommet

Light Diffuser

Overhead Door Opener Set Up

GDO-9V2 GEN2 Enduro, GDO-9V3 GEN2 Dynamo,  

SDO-2V2 CAD P Diamond & SDO-3V2 CAD S

Mount the Charger Board

a.  Unplug the drive unit from mains power.

b. Remove screws and swing open the cover.

c.  Mount the PCB support 

15

 with two screws 

13

. Secure the  charger board 

 8

 on to PCB support with 3 screws 

14

.

d. Unscrew the 2-wire SBY-2 battery harness 

10

 from the 2 pin connector on 

the charger board 

 8

. Feed the 2-wire SBY-2 battery harness 

10

 through the 

grommet on the base plate and secure back on the 2 pin connector.

e.  Remove two (2) screws from the Light Diffuser to access the main control 

board.

f.  Remove the shunt from the 5 pin connector on the control board. Feed the 

charger harness 

 9

 from the charger board 

 8

  through the cover and insert 

into the 5 pin connector on the main control board. 

Mount & Connect the Battery

a.  Mount battery pack on side of unit and secure with items 

11

 and 

12

.

WARNING:

 After Step (b) the opener may become active (even when 

power is off). This is a result of a residual charge in the batteries. 

b. Connect battery harnesses 

 5

 and 

10

 together.

c.  Close the cover, secure the Light Diffuser with 2 screws and reconnect 

power.

NOTE:

 Batteries may take up to 48 hours to charge fully after initial installation.

Re-setup and Test the Opener

a.  Reconnect power and remove button cover.

b. Press either the OSC  button the opener or the programmed transmitter 

button to test the battery backup installation.

c.  Whilst door is in motion, disconnect mains power. The door should continue 

to operate as normal.

NOTE:

 Wait for the door to complete its travel.

d. Press either the OSC button on the opener or the progammed transmitter 

button to activate the door.

e.  Whilst door is in motion, reconnect power and re-install button cover. The 

door should complete the cycle as normal.

Summary of Contents for V-06

Page 1: ...ER CODE 25 BATTERY CP1223H 12V 2 3H 2 15470 26 CHARGER ASSY SBC 02 1 60914 27 BATTERY COUPLING WIRE ESV24 1 12005 28 BATTERY HARNESS 1 15670 29 TAPTITE SCREW P M3 X 8 4 10560 Sliding Gate Openers Important Safety Instructions WARNING DO NOT short the output of batteries Serious personal injury and or property damage can result from failure to follow this warning During charging and discharging cyc...

Page 2: ...and secure right side screw first charger board side 17 b Position the wire battery harness 10 neatly and secure left side of battery kit with cable clamp 7 WARNING After Step c the opener may become active even when power is off This is a result of a residual charge in the batteries c Connect battery harnesses 5 and 10 together d Close the timing cover light diffuser and reconnect power NOTE Batt...

Page 3: ...ver and insert into the 5 pin connector on the main control board Mount Connect the Battery a Mount battery pack on side of unit and secure with items 11 and 12 WARNING After Step b the opener may become active even when power is off This is a result of a residual charge in the batteries b Connect battery harnesses 5 and 10 together c Close the cover secure the Light Diffuser with 2 screws and rec...

Page 4: ...attery Box s nylon gland d Connect the red wire to the Battery Box s terminal and the black wire to the terminal e Feed the other end of the 2 core 18awg gauge cable through the control box s gland f Connect the red wire to the Charger Board s Battery Harness BAT connector and the black wire to the BAT connector Re setup and Test the Opener a Reconnect power b Select Menu 7 on the DCB 05 control b...

Page 5: ...oupling wire 27 through the main cover b Secure the lid to the main cover with screws c Connect battery harnesses 27 and 28 together NOTE Batteries may take up to 48 hours to charge fully after initial installation Re setup and Test the Opener a Reconnect power b Select Menu 7 on the control board press SET select Sub Menu 7 Battery Solar and enable using the OPEN and CLOSE buttons c Setup travel ...

Page 6: ...mains power and allow the batteries to charge This may take 24 48 hours to reach maximum charge capacity Faulty Charger board Disconnect the charger board from batteries and control board Check voltage of the charger board Voltage should be approximately 27 5V Faulty Batteries Disconnect the batteries from the charger board Check the voltage of the each battery Voltage should not drop below 10V Tr...

Page 7: ...tallation configuration or use of the Product contrary to the instructions supplied with the Product g maximum continuous operating time exceeding 1 minute in 10 h the operating force exceeding 15kg 150 Newton when moving the door manually to the open or closed position i door surface area and or weight exceeding 28m2 and 270kg respectively j the door used with the Product not being in safe workin...

Page 8: ...ralia Pty Ltd ABN 25 010 473 971 B D Doors 34 36 Marigold St Revesby NSW 2212 P 13 62 63 E enquires bnd com au W www bnd com au March 2014 Automatic Technology Australia Pty Ltd All rights reserved No part of this document may be reproduced without prior permission In an ongoing commitment to product quality we reserve the right to change specification without notice E OE ...

Reviews: