![B&D 86957 Installation Instructions Download Page 2](http://html.mh-extra.com/html/bandd/86957/86957_installation-instructions_460082002.webp)
b&d group office locations
Head Office
6-8 Fiveways Blvd, Keysborough 3173
Phone (03) 9791 0200
New South Wales
34 Marigold St, Revesby 2212
Phone (02) 9722 5555
Queensland
17 Oasis Court, Clontarf 4019
Phone (07) 3883 0200
Victoria
147-153 Canterbury Rd, Kilsyth 3137
Phone (03) 9237 7766
South Australia
23 Frederick Rd, Royal Park 5014
Phone (08) 8440 4747
Western Australia
96 Mulgul Rd, Malaga 6090
Phone (08) 9247 8777
International/Export
34 Marigold St, Revesby 2212
Phone +61 (0)2 9722 5555
www.bnd.com.au
Prefixed trademarks are the property of B&D Australia Pty Ltd. B&D Doors & Openers
is a division of B&D Australia Pty Ltd. ABN 25 010 473 971. © 2016 B&D Australia Pty Ltd.
2
Auto-Lock Kit -
Installation instructions
your representative is
Smart Hub Set Up
Mounting the Hub
a. Determine whether you are going to wall mount
the hub.
i. If hub is to be placed on bench, simply connect
to power supply
2
, turn on and proceed to
installing the Transceiver.
ii. If hub is to be wall mounted follow steps below.
b. To wall mount - Use wall bracket
3
as template to
mark where to drill holes. Pre-drill holes.
i. For plaster walls - insert (2) two Plastic wall plugs
4
into holes, place wall bracket over holes and
affix with (2) two self tapping screws
5
.
ii. For brick walls - place wall bracket
3
over holes
and affix with (2) two self tapping screws
5
.
c. Slide the hub over the bracket.
d. Connect the power supply
2
and turn on.
1
3
5
This device must be connected to power at all times. DO NOT disconnect power after setup.
Warranty
This warranty is to be read in conjunction with the owner’s
copy of the opener installation instruction.
WARRANTY
ACCESSORIES
1 year
Mounting the Transceiver to the Opener
a. Disconnect the power supply to the opener.
b. Remove the left hand side pocket from the opener.
c. Reach inside the opener and pull out the 5 pin
harness and connect to the wireless basestation
module
6
.
d. Place the module into the pocket and refit the
cover.
e. Download the B&D App and follow the instructions
in the App to setup new smart hub.
f. Use a programmed remote and run the door
through a few cycles which will update the unit
with the details of the transceiver module.
6