BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-627-3925
Document # P45087 rev. E
© Copyright
BAND-IT-IDEX, Inc. 2002
All rights reserved
www.BAND-IT-IDEX.com
Page 1 of 3
C002 JR
Hand Tool
Operating
Instructions
NOTE: USE OF VISE IS OPTIONAL
Place BAND-IT tool in vise. Insert Clamp in Tool and
grip end of band by Band Gripper Lever.
Insert hose in clamp. Take up clamp by turning the
handle of BAND-IT TOOL clockwise. To feel
movement of band, place finger on BAND-IT BAND
at buckle edge while tensioning with tool handle.
When you no longer feel band moving through
buckle, even as you turn handle, MAXIMUM
PRESSURE IS EXERTED BY BAND-IT BAND, and
you should stop turning handle.
Roll hose over approximately 30
°
BACKING OFF
TENSION HANDLE ¼ to ½ turn only, through course
of rollover, depending on type and size of hose. Grip
buckle with hook in nose by pushing cutter handle.
Push cutter handle farther to cut the band completing
BAND-IT JR. Clamp.
The finished BAND-IT JR. Clamp –
To Install a BAND-IT Junior Clamp:
1
3
2
4