background image

 

 

 

 

BAND-IT-IDEX, Inc. 
A Unit of IDEX Corporation 
4799 Dahlia Street 
Denver, CO 80216-3070 USA 
P: 1-800-525-0758 
F: 1-800-624-3925

 

Document # A92051 rev. H  

© Copyright  

BAND-IT-IDEX, Inc. 2006 

All rights reserved 

www.BAND-IT-IDEX.com 

 

Page 1 of 4 

A92079  

Tie-Lok II Tool 

 

 

Warning: 

Always wear safety glasses when operating hand tool. 
 
 
 
 
 
 

Instructions: 

1.  Turn  tension  adjustment  knob  until 

desired  tension  setting  is  displayed  in 
tension 

indicator 

window. 

Space 

between  numbers  counts  as  one-half 
setting. See step 6. 

 
2.  Extend  handle  open  to  release  gripping 

mechanism and insert clamp tail into tool 
through front load entry. 

 
3.  Squeeze  handle  repeatedly  to  tighten 

band  around  object.  Be  sure  to  release 
handle  completely  to  use  full  pull-up 
stroke  of  tool.    Buckle  must  be  secure 
against  the  tool  head  and  nestled 
between  the  two  retention  clips.  Once 
the preset tension has been reached, the 
handle will no longer release completely. 

 
4.  To  cut-off  excess  clamp  tail,  squeeze 

handle one last time.  

 
5.  The tool must be reset by, extending the 

handle  out  until  it  snaps  into  place,  the 
tool  will  be  ready  to  apply  the  next 
clamp. 

 
6.  Tension Setting Range: 
 

.250 Smooth I.D. Tie-Lok      0 – 8 

 
 
 
 

Operating 
Instructions 

 

Tension Indicator 

Window 

Handle 

Tension 

Adjustment 

Knob 

Reviews: