INSTALLATION LAYOUT WITH VAPORISER
3
2
1
4
C
B
D
VAPORIZZA
TORE
B Vaporiser
C Tank
D 1st stage reducer unit
Warnings
• The vaporiser is considered a dangerous point and should there-
fore be situated at a safe distance from any building.
•
The electrical system must be AD-EP (anti-deflagration-explosion
proof).
• The L.P.G. pipelines must be made of SS steel with welded or
flanged joints NP 40 (nominal pressure 40 bar). Threaded joints
are prohibited.
Specific materials
1
Liquid recovery valve
2
Liquid delivery cock with flow limiter.
3
Steel fitting with welded tang and copper washer.
4
18-bar safety valve with welded steel coupling.
24 / 30
0006081528_201711
ENGLISH
Summary of Contents for btg 15 me
Page 2: ......
Page 28: ...SCHEMI ELETTRICI 26 30 0006081528_201711 ITALIANO...
Page 29: ...27 30 0006081528_201711 ITALIANO...
Page 30: ...28 30 0006081528_201711 ITALIANO...
Page 32: ...30 30 0006081528_201711 ITALIANO...
Page 58: ...WIRING DIAGRAMS 26 30 0006081528_201711 ENGLISH...
Page 59: ...27 30 0006081528_201711 ENGLISH...
Page 60: ...28 30 0006081528_201711 ENGLISH...
Page 62: ...30 30 0006081528_201711 ENGLISH...
Page 63: ......