LIQUID FUEL SUPPLY LINE
The following description covers the basic requirements to ensure ef
-
ficient operation.
The unit is equipped with a self-priming pump capable of sucking oil
directly from the tank also for the first fill-up.This statement is valid only
if the necessary conditions exist, see the pipe dimensioning diagrams.
To ensure an efficient operation, it is better to make suction and return
pipes with welded fittings and to avoid the use of threaded connections
which often cause air infiltration’s interfering with the pump operation
and consequently with the burner.
Where a removable fitting is required, use the welded flange method
with a fuel resistant gasket inserted to ensure a perfect sealing.For sy
-
stems requiring pipes with a relatively small diameter, we recommend
using copper pipes.
For unavoidable connections we recommend using "biconic" fittings.
The basic diagrams for the different system types depending on the
position of the tank with respect to the burner are shown below.The
intake pipe should run up-slope towards the burner to avoid the possi
-
ble build-up of gas bubbles.Where more than one burner is installed in
one boiler room, it is essential that each burner has its own intake pipe.
Only return pipes can lead to a single manifold pipe with an adequate
cross section leading to the tank. Avoid at all costs connecting directly
the return pipe on the intake pipe.
It is advisable to properly insulate the intake and return pipes to pre
-
vent cooling which would affect the unit’s efficiency.Pipe diameters (to
be strictly complied with) are listed in the following tables.
The maximum amount of vacuum that the pump can withstand noise
-
lessly under normal operating conditions is 0.47 bar; if these limit is
exceeded normal pump operation will no longer be guaranteed.
Maximum suction and return pressure = 1 bar.
AUXILIARY PUMP
In some cases (excessive distance or differences in level) the system
must be implemented with a "loop" supply circuit with an auxiliary
pump, avoiding to connect the burner pump directly to the tank.
In this case, the auxiliary pump can be started when the burner starts
and stopped when it stops.
Always follow the instructions below:
•
The auxiliary pump must be installed as close as possible to the
liquid to be sucked.
•
The head must be suitable for the relative plant.
•
We recommend a flow rate equal at least to that of the burner pump.
•
The connection pipes must be dimensioned based on the flow rate
of the auxiliary pump.
•
Avoid electrically connecting the auxiliary pump directly to the remo
-
te control switch of the burner.
•
Adjust the pressure at approx. 0.5 - 1 bar, if the circuit is equipped
with a pressure regulator.
ENGLISH
14 / 54
0006160337_202006
Summary of Contents for 56570010
Page 2: ......
Page 44: ...SCHEMI ELETTRICI TBML 80 120 160 ITALIANO 42 54 0006160337_202006...
Page 45: ...ITALIANO 43 54 0006160337_202006...
Page 46: ...ITALIANO 44 54 0006160337_202006...
Page 47: ...ITALIANO 45 54 0006160337_202006...
Page 48: ...BT1 BA BP I1 I2 I3 I4 ITALIANO 46 54 0006160337_202006...
Page 50: ...TBML 210 310 ITALIANO 48 54 0006160337_202006...
Page 51: ...ITALIANO 49 54 0006160337_202006...
Page 52: ...ITALIANO 50 54 0006160337_202006...
Page 53: ...ITALIANO 51 54 0006160337_202006...
Page 54: ...BT1 BA BP I1 I2 I3 I4 ITALIANO 52 54 0006160337_202006...
Page 56: ...ITALIANO 54 54 0006160337_202006...
Page 98: ...WIRING DIAGRAMS TBML 80 120 160 ENGLISH 42 54 0006160337_202006...
Page 99: ...ENGLISH 43 54 0006160337_202006...
Page 100: ...ENGLISH 44 54 0006160337_202006...
Page 101: ...ENGLISH 45 54 0006160337_202006...
Page 102: ...BT1 BA BP I1 I2 I3 I4 ENGLISH 46 54 0006160337_202006...
Page 104: ...TBML 210 310 ENGLISH 48 54 0006160337_202006...
Page 105: ...ENGLISH 49 54 0006160337_202006...
Page 106: ...ENGLISH 50 54 0006160337_202006...
Page 107: ...ENGLISH 51 54 0006160337_202006...
Page 108: ...BT1 BA BP I1 I2 I3 I4 ENGLISH 52 54 0006160337_202006...
Page 110: ...ENGLISH 54 54 0006160337_202006...
Page 111: ......