![Baltimore Aircoil Company DFCV-AD-EC Series Operating And Maintenance Instructions Manual Download Page 26](http://html1.mh-extra.com/html/baltimore-aircoil-company/dfcv-ad-ec-series/dfcv-ad-ec-series_operating-and-maintenance-instructions-manual_470211026.webp)
Waterfeed assembly
12. Tighten the sleeve clamps to secure the water feed assembly in place.
Flexible sleeve connection with sleeve clamps
13. Connect the flexible pipe to the city water supply. Use the "pad maintenance" switch to open the city water
valve. Check the collector for any holes that remain clogged. If some holes are still clogged, repeat the
procedure.
14. Place the pre-cooling media back in the pre-cooler section. Refer to section "Adiabatic pre-cooling media" on
W W W . B A L T I M O R E A I R C O I L . E U
26