7
24
14
78
21
12
Ø2
39
55
Page 1: ...890123 1234567890123456789012345678901212345678901234567890123 1234567890123456789012345678901212345678901234567890123 1234567890123456789012345678901212345678901234567890123 1234567890123456789012345...
Page 2: ...use unless all screws are tight At least every six months check all screws to be sure they are tight If parts are missing broken damaged or worn stop use of the product until repairs are made by your...
Page 3: ...EGINNING TO END BEFORE STARTING TO ASSEMBLE UNIT 1 2 4 3 Identify and Separate all the Parts and Hardware Place the Top Platform P 1 with the Predrilled holes facing up and install 3 each Leg Plates P...
Page 4: ...each Threaded Studs A2 as shown in illustration 3 Short threaded end goes into the Monitor Shelf P 2 8 A3 P 6 Attach 2 each Locking Plate Casters E to the CPU Platform P 6 using 8 Screws B as shown i...
Page 5: ...met Sleeve C into the hole in the Top Platform P 1 Snap1 Grommet Cap D over the top of Grommmet Sleeve C Insert 1 Grommet Sleeve C into the hole in the Monitor shelf P 2 Snap 1 Grommet Cap D over the...
Page 6: ...6 89833 Corner Desk Right w Moitor Shelf and CPU Holder Shipping Information 1 4 Cubic Feet 20 lbs 4 26 21 89833 12 21 05 21 34 For more information 1 800 749 2258 39 39 28 39 15 X 11 24...
Page 7: ...7 241 4 781 4 211 2 211 2 2 781 4 391 4 12 391 4 551 2...