background image

6

english

3.1 

Scope of delivery

–  IO-Link master

–  1 × Screw M4x6

–  1 × spring lock washer

–  4 × cap

–  20 × label

–  Grounding strap

–  Installation guide
Accessories are not included in the scope of delivery and 

must be ordered separately.

Recommended accessories can be found at 

www.balluff.com

 on the product page.

3.2 

Transport

 

Transport product to location of use in original 

packaging.

3.3 

Storage conditions

 

Store product in original packaging.

 

Observe ambient conditions (see 

Ambient conditions

 

on page 13).

Scope of delivery, transport and storage

BNI PG3-508-0C5-Z015

Network interface

Summary of Contents for BNI PG3-508-0C5-Z015

Page 1: ...deutsch Betriebsanleitung english User s guide BNI PG3 508 0C5 Z015...

Page 2: ...www balluff com...

Page 3: ...BNI PG3 508 0C5 Z015 Betriebsanleitung deutsch...

Page 4: ...www balluff com...

Page 5: ...hreibung 7 4 1 Aufbau 7 4 2 Funktion 7 4 3 Anzeigeelemente 8 4 4 Bedruckung 8 5 Einbau und Anschluss 9 5 1 Einbau 9 5 2 Elektrischer Anschluss 9 5 2 1 Spannungsversorgung 9 5 2 2 PROFINET Schnittstell...

Page 6: ...rden mit einem Gr erzeichen verbun den z B Einstellungen Optionen steht f r den Men befehl Optionen aus dem Men Einstellungen Hinweis Tipp Dieses Symbol kennzeichnet allgemeine Hinweise 1 4 Bedeutung...

Page 7: ...raft ist wer aufgrund seiner fachli chen Ausbildung seiner Kenntnisse und Erfahrungen sowie seiner Kenntnisse der einschl gigen Bestimmungen die ihm bertragenen Arbeiten beurteilen m gliche Gefah ren...

Page 8: ...alb getrennt zu bestellen Empfohlenes Zubeh r finden Sie unter www balluff com auf der Produktseite 3 2 Transport Produkt in Originalverpackung bis zum Verwendungs ort transportieren 3 3 Lagerbedingun...

Page 9: ...te bersicht 4 2 Funktion Der Profinet IO Link Master ist ein dezentrales und konfi gurierbares Gateway das die Eingangs und Ausgangssig nale von Standardsensoren und aktoren sowie Prozess daten von an...

Page 10: ...ierung fehlgeschlagen falsche Konfiguration der IO Link Datenl nge Rot schnell blinkend Datenhaltung fehlgeschlagen falsches Device f r Datenhaltung Rot IO Link Kurzschluss Pin 4 gegen Pin 3 Tab 4 2 L...

Page 11: ...Spannungsversorgungen f r Sensorik und Aktorik getrennt absichern Auf eine ausreichende Dimensionierung der Span nungsversorgung des Ger ts achten um Anlauf und Spitzenstr me abzudecken und das Absich...

Page 12: ...g nge EN 61131 2 Typ 3 Ungenutzte Ports m ssen mit Abdeckkappen versehen werden um die Schutzart IP67 zu gew hrleisten 5 Einbau und Anschluss Fortsetzung 5 2 4 Erdung Um EMV St rungen entgegenzuwirken...

Page 13: ...teller die korrekten Werte pr fen 6 2 Betrieb VORSICHT Verbrennungsgefahr durch hei e Oberfl chen Das Geh use erw rmt sich unter normalen Betriebsbe dingungen Es besteht die Gefahr von Brandverlet zun...

Page 14: ...e Kontakt mit unserem Service Center auf 7 2 Demontage Ger t nur in spannungsfreiem Zustand demontieren 7 3 Entsorgung Befolgen Sie die nationalen Vorschriften zur Entsor gung Weitere Informationen fi...

Page 15: ...beltypen gem IEEE 802 3 Geschirmtes verdrilltes Leitungspaar min STP CAT 5 STP CAT 5e Daten bertragungsrate 10 100 Mbit s Max Kabell nge 100 m Flusskontrolle Halbduplex Vollduplex IEEE 802 33x Pause I...

Page 16: ......

Page 17: ...BNI PG3 508 0C5 Z015 User s guide english...

Page 18: ...www balluff com...

Page 19: ...4 1 Construction 7 4 2 Function 7 4 3 Display elements 8 4 4 Labeling 8 5 Installation and connection 9 5 1 Installation 9 5 2 Electrical connection 9 5 2 1 Power supply 9 5 2 2 PROFINET interface 10...

Page 20: ...ined with a greater than sign e g Settings Options stands for the menu command Options from the Settings menu Note tip This symbol indicates general notes 1 4 Explanation of the warnings Always observ...

Page 21: ...nnel are persons whose technical training knowledge and experience as well as knowledge of the relevant regulations allows them to assess the work assigned to them recognize possible hazards and take...

Page 22: ...y and must be ordered separately Recommended accessories can be found at www balluff com on the product page 3 2 Transport Transport product to location of use in original packaging 3 3 Storage condit...

Page 23: ...le FE connection Device overview 4 2 Function The Profinet IO Link master is a decentralized and configurable gateway that processes and evaluates the input and output signals of standard sensors and...

Page 24: ...fast flashing Validation failed incorrect configuration of the IO Link data length Red fast flashing Data storage failed incorrect device for data storage Red IO Link Short circuit of pin 4 against p...

Page 25: ...ower supplies for sensors and actuators separately Make sure that the power supply of the device is sufficiently dimensioned to cover start up and peak currents and design the fuse protection concept...

Page 26: ...inputs EN 61131 2 type 3 Unused ports must be covered with caps to ensure IP67 protection 5 Installation and connection continued 5 2 4 Grounding To counteract EMC interference the functional earth co...

Page 27: ...or after repair by the manufacturer 6 2 Operation CAUTION Danger of burns from hot surfaces The housing heats up under normal operating conditions There is a risk of burn injuries Avoid direct skin c...

Page 28: ...e contact our Service Center 7 2 Disassembly Only disassemble the device when it is de energized 7 3 Disposal Observe the national regulations for disposal Additional information can be found at www b...

Page 29: ...oded socket Cable types as per IEEE 802 3 Shielded twisted pair min STP CAT 5 STP CAT 5e Data transmission rate 10 100 Mbit s Max cable length 100 m Flow control Half duplex full duplex IEEE 802 33x P...

Page 30: ...hengshan Rd 8F Building A Yunding International Commercial Plaza 200125 Pudong Shanghai Phone 86 400 820 0016 Fax 86 400 920 2622 service cn balluff com cn DACH Service Center Germany Balluff GmbH Sch...

Reviews: