Á>UÁ¿É¸¿tµ¿>¸¸¸Á>Ug[¿¿£l½½¤¿lu¼l¼¼¿¿N¿¿ÑÑѦ
L>ggg¦U
¿
12
ASSEMBLY
BACK SIDE
FRONT SIDE
18
Hang each Door
K
/
L
by resting the wheels of the Roller Hangers
?
on top of the Door Rail
I
and settling
the track on the bottom edge of the door onto the
Track Pin
9
.
K
9
L
I
19
Secure each
Roller Hanger
?
to
the Door Rail
I
by inserting a
Screw Bolt
?
as shown.
BACK SIDE
FRONT SIDE
Hardware Required:
?
Screw Bolt (4x12mm) x4
Your Siena Coffee Table is ready for use!