background image

2

POWER ON

1.Main Unit Installation

2.Sensor Installation

Switch to CH1

Switch to CH2

Switch to CH3

Step 1, Select the channel 

you desired to use.

Step 1,  Remove the battery compartment 

  cover and insert 2xAAA batteries.

Step 2, Load the 2xAA batteries

in 3 minutes to ensure

RF signal received in time.

Battery 

compartment 

Reviews: