background image

IEC Three Phase AC Motors

(Aluminum Frame)

Installation & Operating Manual

7/09

MN301

Summary of Contents for MN301

Page 1: ...IEC Three Phase AC Motors Aluminum Frame Installation Operating Manual 7 09 MN301...

Page 2: ...unting 2 1 Alignment 2 1 Vibration 2 2 Power Connection 2 2 Grounding 2 2 Conduit Box 2 3 AC Power 2 3 Connections 2 3 Guarding 2 3 First Time Start Up 2 4 Coupled Start Up 2 4 Jogging and Repeated St...

Page 3: ...shock can cause serious or fatal injury WARNING Be sure the system is properly grounded before applying power Do not apply AC power before you ensure that all grounding instructions have been followed...

Page 4: ...To prevent equipment damage be sure that the electrical service is not capable of delivering more than the maximum motor rated amps listed on the rating plate Caution If a HI POT test High Potential I...

Page 5: ...Alignment Accurate alignment of the motor with the driven equipment is extremely important The pulley sprocket or gear used in the drive should be located on the shaft as close to the shaft shoulder a...

Page 6: ...ection of L1 L2 L3 to Rotation Direction viewed from Drive End U1 V1 W1 W1 V1 U1 clockwise CW counter clockwise CCW Adjustable Frequency Power Inverters Consult the drive instructions for maximum acce...

Page 7: ...or shaft to ensure that it rotates freely 6 Replace all panels and covers that were removed during installation 7 Momentarily apply power and check the direction of rotation of the motor shaft 8 If mo...

Page 8: ...All rights reserved Printed in USA 7 09 E 2009 Baldor Electric Company MN301 World Headquarters P O Box 2400 Fort Smith AR 72902 2400 USA Ph 1 479 646 4711 Fax 1 479 648 5792 www baldor com...

Reviews: