background image

Page  4

ELECTRICAL CONNECTION

Balboa advises that an earth leakage or residual current 
protection device must be fitted to all installations. 
Exactly match supply voltage to name plate voltage 
220/240 Volt 50Hz (single phase only). 

Incorrect voltage 

can cause fire or seriously damage the motor which is 
not covered by your Balboa warranty! 

Balboa 200 Series hydromassage pumps are suitable 

t

for connection to 220/240 Volt 50 Hz power outlets.
Electrical supply must conform to local/national 

t

electrical standards.

NOTE: 

The power supply lead has a type Y connector 

and if service is required to the power lead it must 
be replaced with the appropriate special power lead 
assembly. Warranty is void if unauthorized modifications 
are made to any component.

Plug the hydromassage pump power cord into a 
dedicated 10 Amp power socket and switch the 
power on. 

All hot pump heaters have an in-built pressure sensor 
that will only allow the heater to activate when there is 
sufficient water flowing through the system.

 

NOTE:

WARNING – To reduce the risk of electric 

t

shock, contact a qualified electrician to replace 
the damaged cord and related electrical 
components immediately.

All hydromassage pumps must be installed in 

t

accordance with relevant electrical standards. 

TOUCH PAD ASSEMBLY AND INSTALLATION

These pumps are supplied with a low voltage electronic 
touch pad and a 6 metre signal cable to control the pump 
and heater functions. 

Assembly (2374, 2394, 2404) 

Click the escutcheon onto the touch pad. Then apply the 
decal label to the face of the touch pad (ensuring that is it  
correct way up). 

Installation

 

To mount the touch pad to the bath, a 26mm 

t

diameter hole is required for models 2374, 2394 and 
2404. Models 2376, 2377, 2386, 2387, 2396, 2397, 2406 
and 2407 require a 38mm hole to be able to mount 
the touch pad flush on the bath surface (usually pre-
drilled by the bath manufacturer). 
If a hole is required to be drilled, drill the hole in the 

t

required location on the rim of the bath ensuring that 
there is enough clearance for the outer rim of the 
touch pad to sit flush to the spa bath surface. 
Prior to mounting the touch pad, thread the signal 

t

cable through the hole in the bath surround and 
plug the signal cable into the back of the touch pad 
ensuring the signal cable end with the rubber boot is 
free to plug into the pump. 
Clean all rough edges from around the hole, apply 

t

a bead of silicone to the underside rim of the touch 
pad box only to secure it to the bath surface and 
prevent water leaking under the bath. 

Do not

 silicone 

the clip on the escutcheon to the bath surface. 
Position touch pad into the hole and allow to dry. 

t

Insert the loose end of the signal cable (with the 

t

rubber boot) into the signal cable socket located 
on the pump. Push the rubber boot onto the heater 
element control box to prevent any ingress of water 
into the pump.

Cut Groove on Air Vent

Signal cable socket

 

Fig. 2

Summary of Contents for 2374

Page 1: ...Balboa 200 Series Electronic Hydromassage Pumps Models 2374 2394 and 2404 Hot Pump Bathmaster Models 2376 2386 2396 and 2406 DR Pump without heater Models 2377 2387 2397 and 2407 DR Pump with heater T...

Page 2: ...u will not and will not attempt to modify prepare derivative works of reverse engineer decompile disassemble or otherwise attempt to create source code from the software No title to or ownership in th...

Page 3: ...must be protected from t exposure to the weather If the pump is installed outside a protective cover is required PIPING WARNING The ttings on these hydromassage pumps are constructed of ABS Some PVC...

Page 4: ...ouch pad and a 6 metre signal cable to control the pump and heater functions Assembly 2374 2394 2404 Click the escutcheon onto the touch pad Then apply the decal label to the face of the touch pad ens...

Page 5: ...has 2 or 3 buttons on it JETS button turns on off the pump and 1 integrated heater HEAT button enables the heater to be turned on 2 off whilst the pump is running If equipped with an optional blower...

Page 6: ...mage to the pump from occurring as a result of the pump operating without water owing through it If at any stage during the normal operation of the pump the pump loses prime eg a blocked suction scena...

Page 7: ...heater element This is normal in the standard pumps models 2376 2386 2396 2406 Heater Module does not operate Contact Service Technician Heater Module is too small for the capacity of the bath Con rm...

Page 8: ...Assy 1 3 Tail and Air bleed Assy 1 11 Screws Cover 8 4 Casing 1 12 Screws Casing 4 5 Diffuser 1 13 Nuts Casing 4 6 Impeller 1 14 Base and Screws Kit 1 7A Mechanical Seal Kit 1 15 Heater Module Assy Ho...

Page 9: ...credit department invoices may be due thirty 30 days from the date of invoice or on such other terms as approved by the company s credit department in writing The credit department may decline at any...

Page 10: ...cation of the United Nations Convention on Contracts for the International Sale of Goods and INCOTERMS 2000 In the event a judicial proceeding is necessary the sole forum for resolving disputes arisin...

Page 11: ...me and address The serial number if applicable Freight is at sender s expense unless otherwise authorized by BWG A 50 USD 40EUR hourly fee plus reimbursement of all shipping expenses if applicable wil...

Page 12: ...cannot be processed d If the product is under warranty and can not be rectified over the phone the representative will determine if the product qualifies for warranty service or warranty part replace...

Reviews: