Page 4
ELECTRICAL CONNECTION
Balboa advises that an earth leakage or residual current
protection device must be fitted to all installations.
Exactly match supply voltage to name plate voltage
220/240 Volt 50Hz (single phase only).
Incorrect voltage
can cause fire or seriously damage the motor which is
not covered by your Balboa warranty!
Balboa 200 Series hydromassage pumps are suitable
t
for connection to 220/240 Volt 50 Hz power outlets.
Electrical supply must conform to local/national
t
electrical standards.
NOTE:
The power supply lead has a type Y connector
and if service is required to the power lead it must
be replaced with the appropriate special power lead
assembly. Warranty is void if unauthorized modifications
are made to any component.
Plug the hydromassage pump power cord into a
dedicated 10 Amp power socket and switch the
power on.
All hot pump heaters have an in-built pressure sensor
that will only allow the heater to activate when there is
sufficient water flowing through the system.
NOTE:
WARNING – To reduce the risk of electric
t
shock, contact a qualified electrician to replace
the damaged cord and related electrical
components immediately.
All hydromassage pumps must be installed in
t
accordance with relevant electrical standards.
TOUCH PAD ASSEMBLY AND INSTALLATION
These pumps are supplied with a low voltage electronic
touch pad and a 6 metre signal cable to control the pump
and heater functions.
Assembly (2374, 2394, 2404)
Click the escutcheon onto the touch pad. Then apply the
decal label to the face of the touch pad (ensuring that is it
correct way up).
Installation
To mount the touch pad to the bath, a 26mm
t
diameter hole is required for models 2374, 2394 and
2404. Models 2376, 2377, 2386, 2387, 2396, 2397, 2406
and 2407 require a 38mm hole to be able to mount
the touch pad flush on the bath surface (usually pre-
drilled by the bath manufacturer).
If a hole is required to be drilled, drill the hole in the
t
required location on the rim of the bath ensuring that
there is enough clearance for the outer rim of the
touch pad to sit flush to the spa bath surface.
Prior to mounting the touch pad, thread the signal
t
cable through the hole in the bath surround and
plug the signal cable into the back of the touch pad
ensuring the signal cable end with the rubber boot is
free to plug into the pump.
Clean all rough edges from around the hole, apply
t
a bead of silicone to the underside rim of the touch
pad box only to secure it to the bath surface and
prevent water leaking under the bath.
Do not
silicone
the clip on the escutcheon to the bath surface.
Position touch pad into the hole and allow to dry.
t
Insert the loose end of the signal cable (with the
t
rubber boot) into the signal cable socket located
on the pump. Push the rubber boot onto the heater
element control box to prevent any ingress of water
into the pump.
Cut Groove on Air Vent
Signal cable socket
Fig. 2