background image

16

 

WHAT IS COVERED

This warranty covers defects in material and workmanship under normal use, and applies only to the original purchaser 
providing that:
* The equipment has not been accidentally or intentionally damaged, altered or misused;
* The equipment is properly installed, adjusted, operated and maintained in accordance with National and local codes. and 

in accordance with the installation instruction provided with the product;

*

The serial number rating plate affixed to the equipment has not been defaced or removed.

WHO IS COVERED

This warranty is extended to the original purchaser and applies only to equipment purchased for use in the U.S.A.

COVERAGE PERIOD

Full size gas and electric deck ovens: Two (2) year limited parts and labor: Cyclone Convection Ovens: BCO Models: One (1) 
Year limited parts and labor; GDCO Models: Two (2) Year limited parts and labor; CO II Models: Two (2) Year limited parts 
and labor; (5) Year limited door warranty.
All Other Products: One (1) Year limited parts and labor.
Warranty period begins the date of dealer invoice to customer or ninety (90) days after shipment date from BAKERS PRIDE - 
whichever comes first.

WARRANTY 

This  warranty  covers  on-site  labor,  parts  and  reasonable  travel  time  and  travel  expenses  of  the  authorized  service 

COVERAGE

representative up to (100) miles. round trip, and (2) hours travel time. The purchaser. however, shall be responsible for all 
expenses related to travel, including time. mileage and shipping expenses on smaller counter models that may be carried into 
a Factory Authorized Service Center, including the following models: PX-14. PX-16, PI8, and BK-I8.

EXCEPTIONS

All removable parts in BAKERS PRIDE Char-broilers, including but not limited to: Burners, Grates. Radiants, Stones and 
Valves, are covered for a period of SIX MONTHS.
All Ceramic Baking Decks are covered for a period of THREE MONTHS. The installation of these replacement decks is the 
responsibility of the purchaser.
The extended Cyclone door warranty years 3 through 5 is a parts only warranty and does not include labor, travel, milage or 
any other charges.

EXCLUSIONS

*

Negligence or acts of God,

*

Thermostat calibrations after (30) days from equipment
installation date,

*

Air and Gas adjustments,

* Light bulbs,

*

Glass doors and door adjustments.

*

Fuses,

*

Char-broiler work decks and cutting boards,

* Tightening of conveyor chains,

*

Adjustments to burner flames and cleaning of pilot burners,  

* Tightening of screws or fasteners.

*

Failures caused by erratic voltages or gas supplies,

*

Unauthorized repair by anyone other than a BAKERS PRIDE

Factory Authorized Service Center,

*

Damage in shipment,

* Alteration, misuse or improper installation,

*

Thermostats and safety valves with broken capillary tubes. 

*

Accessories - spatulas, forks. steak turners, grate lifters,
oven brushes, scrapers, peels. Etc.,

* Freight - other than normal UPS charges,

*

Ordinary wear and tear.

INSTALLATION

Leveling and installation of decks. as well as proper installation and check out of all new equipment - per appropriate 
installation and use materials - is the responsibility of the dealer or installer, not the manufacturer.

REPLACEMENT 

BAKERS PRIDE genuine Factory OEM parts receive a (90) day materials warranty effective from the date of installation by a 

PARTS

BAKERS PRIDE Factory Authorized Service Center.

This Warranty is in lieu of all other warranties, expressed or implied, and all other obligations or liabilities on the manufacturers part. BAKERS PRIDE 
shall in no event be liable for any special, indirect or consequential damages, or in any event for damages in excess of the purchase price of the unit. The 
repair or replacement of proven defective parts shall constitute a fulfillment of all obligations under the terms of this warranty.

V. BAKERS PRIDE LIMITED WARRANTY

30 Pine Street  New Rochelle, New York  10801

914 / 576 - 0200 

 US & Canada: 1 - 800 - 431 - 2745 

 fax 914 / 576 - 0605

Form #U4177A 1/07

Summary of Contents for Dante CH-10

Page 1: ...emely dangerous Post in a prominent location instructions to be followed in the event you smell gas Obtain these instructions from your local gas supplier WARNING Improper installation adjustment alte...

Page 2: ...FUTURE REFERENCE Please complete this information and retain this manual for the life of the equipment For Warranty Service and or Parts this information is required Model Number Serial Number Date P...

Page 3: ...7 c Hamburgers 7 d Thickness 7 e Cooking Tools 7 3 Helpful Hints 7 4 Maintenance 7 a Service 7 b Care and Cleaning of Top Grates 8 c Grease Collection 8 d Cleaning Tools 8 5 Average Production Guide...

Page 4: ...ude the following options Ceramic briquettes designated by a GS Suffix on the model number 2 INSTALLATION a In USA INSTALLATION of this broiler must conform with the latest edition of the National Fue...

Page 5: ...the steps below a Install all burners with deflector shield assemblies attached B Place the front of the burner into the valve assembly by fitting the center hole of the mixer cap over the brass orif...

Page 6: ...ver more than 50 of the BROILING area Each Griddle Plate fits on top of two grates one 4 1 2 and one 6 It is not necessary to remove the top grates and radiants before installing the griddle plate 10...

Page 7: ...the hamburger contracts and becomes thicker and smaller in diameter Pressing the hamburger out thin before broiling will compensate for the shrinkage Broil a hamburger as you would broil a steak 1 Be...

Page 8: ...rly production as a guide only Actual production may vary depending on required doneness thickness and weight of product 5 AVERAGE PRODUCTION GUIDE XX 12 III TROUBLE SHOOTING GUIDE CAUTION Take extrem...

Page 9: ...ame close all the burner valves allow to cool and then remove the top grate and radiant over the burner Remove the burner by lifting the rear of the burner off the support pin slide it towards the rea...

Page 10: ...Burner Valve Burner Manifold Orifice A FIGURE 2 AIR MIXER CAP AND PILOT BURNERS Pilot Burners Pilot Flame Adjusting Screw Air Mixer Cap Manifold A Air Mixer Cap Valve Extension Straight Valve Handle B...

Page 11: ...XX 12 Pressure Tap Nozzle Assy Gas Inlet Pipe XX Series Valve Pilot Dual Pilot Tubing 7 3 8 XX Series Valve Burner LML w o Knob Knob Gas Valve On Off XX Series Burner Assy Complete Tube 24 XX Burner O...

Page 12: ...BAKERS PRIDE Page 2 of 4 Note When ordering ALWAYS specify Part Model Serial Voltage Phase type of Gas 2 05 XX 4 6 8 10 12 Gas Char Broiler Figure A Exterior Grates Fish Grate Cast Iron Grate Roll A...

Page 13: ...T1250A NOTE 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Control Panel XX 4 Control Panel XX 6 Control Panel XX 8 Control Panel XX 10 Control Panel XX 12 Top Front Trim XX 4 Top Front Trim XX 6 Top Front...

Page 14: ...de com fax US Canada web address BAKERS PRIDE Figure A Exploded View Page 2 of 4 Note When ordering ALWAYS specify Part Model Serial Voltage Phase type of Gas 8 03 CH 6 8 10 12 14 1 3 4 5 2 6 7 8 9 10...

Page 15: ...hield w Handleset 3 CH 18 14 L5019X Tube Burner Assy w Grease Guard 55 T3086X S S Heat Shield w Handleset 4 CH 20 15 L5013X Tube Burner w Air Mixer Cap 56 T3087X S S Heat Shield w Handleset 4 CH 22 16...

Page 16: ...riod of THREE MONTHS The installation of these replacement decks is the responsibility of the purchaser The extended Cyclone door warranty years 3 through 5 is a parts only warranty and does not inclu...

Reviews: