background image

6  | Baker Hughes

Copyright 2023 Baker Hughes Company. All rights reserved.

(1)

 These models should only be used for applications that require high gain. Consult Baker Hughes prior to selecting these models.

Remote Setpoint Change Options

•  The SM-1000 series motors accept a 24 VDC or 120 VAC input. The SM-1100 series motors accept a 4-20 MA signal and require 

a separate 24 VDC or 120 VAC power connection.

•  The total motor rotation is adjustable. The maximum number of motor rotations possible coupled with the spring rate determines 

the total setpoint range.

VRP-CH Pilot Selection Chart

Model Number

Control Range 

(psig/kPa)

Spring Color 

(Part Number)

Setpoint Change per 

Revolution of  

Setpoint Screw 

(psig/kPa)

Setpoint Range 

Discrete Remote 

Control (SM-1100)

Setpoint Range 

Analog (4-20 mA) 

Remote Control 

(SM-1000)

VRP-175-CH

(1)

 

3  -  10  

psig 

 

20   -  69  

kPa

Gold 

(25-8236)

 

0.57  psig 

 

3.9   kPa

 

3.1 psig 

 

21   kPa

 

9   psig 

 

62.1  kPa

 

7  -  30 

psig 

 

48  -  207   kPa

Beige 

(25-8238)

 

2.0   psig 

 

13.7  kPa

 

11   psig 

 

75.8  kPa

 

23   psig 

 

159   kPa

 

15  -  50  

psig 

  103  -  345   kPa

Burgundy 

(25-8239)

 

3.0   psig 

 

21   kPa

 

16.5  psig 

 

114   kPa

 

35   psig 

 

241   kPa

 

20  -   85   psig 

  138  -  596   kPa

Pink 

(25-8240)

 

6.4   psig 

 

44   kPa

 

35.2 psig 

 

243   kPa

 

65   psig 

 

448   kPa

 

50  -  175   psig 

  345  -  1207   kPa

Yellow 

(25-1306)

 

23   psig 

 

157   kPa

 

125   psig 

 

862   kPa

 

125 psig 

 

862 kPa

VRP-600-CH

 

5  -   40   psig 

 

34  -  246   kPa

Gold 

(25-8236)

 

2.1   psig 

 

14.6  kPa

 

11.5  psig 

 

79   kPa

 

35 psig 

 

241 kPa

 

25  -  140   psig 

  172  -  965   kPa

Beige 

(25-8238)

 

7.4   psig 

 

51   kPa

 

41   psig 

 

283 kPa

 

115 psig 

 

793 kPa

 

50  -   175   psig 

  345  -  1207  kPa

Burgundy 

(25-8239)

 

11.3  psig 

 

78   kPa

 

62   psig 

 

427   kPa

 

125 psig 

 

862 kPa

  135  -  300   psig 

  931  -  2069  kPa

Pink 

(25-8240)

 

24   psig 

 

164   kPa

 

132   psig 

 

910   kPa

 

165 psig 

 

1138 kPa

  275  -  600  psig 

 1896 - 4137  kPa

Yellow 

(25-1306)

 

85   psig 

 

586   kPa

 

425   psig 

 

2930 kPa

 

425 psig 

 

2930 kPa

VRP-1000-CH

  550  -  1000  psig 

  3792  -  6895  kPa

Yellow 

(25-1306)

 

143 psig 

 

990 kPa

 

700   psig 

 

4826 kPa

 

700 psig 

 

4826 kPa

VRP-1500-CH

  800  -  1300  psig 

  5516  -  8964  kPa

Grey 

(25-1562)

 

227   psig 

 

1565 kPa

 

850   psig 

 

5860 kPa

 

850 psig 

 

5860 kPa

  900 - 1500  psig 

  6205  -  10342 kPa

Violet 

(25-8073)

 

276   psig 

 

1903 kPa

 

950 psig 

 

6550 kPa

 

950 psig 

 

6550 kPa

Summary of Contents for Becker VRP-CH Series

Page 1: ...VRP CH Series Valve Regulator Pilots Instruction Manual Rev A Baker Hughes Data Classification Public...

Page 2: ...R REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET IN...

Page 3: ...l Models 27 175 600 CH Cap Assembly 28 1000 1500 CH Cap Assembly 29 List of Recommended Tools 29 Part Silhouettes 30 Introduction The Becker VRP CH series double acting pilot represents a breakthrough...

Page 4: ...r Underpressure protection standby Relief valve Backpressure control Power plant type applications 1 Unique Bleed to Pressure System BPS Any large downstream systems city gate stations inter system pr...

Page 5: ...t supplied with Becker actuators from Baker Hughes 2 inch pipe mount provided for retrofit to other manufacturers actuators Materials of Construction External Parts AL 2024 Anodized Aluminium 316 Stai...

Page 6: ...kPa Beige 25 8238 2 0 psig 13 7 kPa 11 psig 75 8 kPa 23 psig 159 kPa 15 50 psig 103 345 kPa Burgundy 25 8239 3 0 psig 21 kPa 16 5 psig 114 kPa 35 psig 241 kPa 20 85 psig 138 596 kPa Pink 25 8240 6 4...

Page 7: ...ome factory adjusted for your particular application The use of the adjustment procedures will be necessary upon installation of a rubber goods replacement kit or any other disassembly or reassembly o...

Page 8: ...he proper False Signal pressure Additionally an SP series setpoint adjustment pump may be used to provide a False Signal pressure above the available pipeline gas pressure Note It is recommended that...

Page 9: ...he sensitivity adjustment drum in the proper direction While the regulator is in control the cylinder top and cylinder bottom gauges may not be equal The cylinder balance pressure Pc is attained by av...

Page 10: ...o periodically test the pilot to help ensure optimum performance We recommend the following procedure once a year 1 Close the cylinder block valves to prevent the control valve from moving 2 Close the...

Page 11: ...wever common practice suggests that replacement of rubber goods on a five year cycle provides adequate preventative maintenance Parts Ordering The following is provided to allow the ordering of replac...

Page 12: ...18 19 20 11 10 9 8 7 2 1 VRP CH BLANK ASSY NOTES 30 0010 0 2 4 6 0 2 4 6 REP DRAWING NUMBER REVISI0N BY DATE SEAT NOZZLE DESIGN REVISED DRAWN BY DATE SCALE APPR0VED BY 1 19 99 1 3 4 TS N A TS a ALL R...

Page 13: ...x 1 2 SHCS Alloy FEP only 11 95 2671 O ring 141 12 30 7007 Std Tube Cap 13 25 1306 Yellow Spring 14 30 7002 Spring Cart for 75 600 CH 15 25 1062 Thrust Bearing 16 30 7006 Standard Bearing Case 17 30...

Page 14: ...14 25 1306 Yellow Spring 15 25 1562 Grey Spring for 1500 CH 800 1300 psig 16 25 8073 Violet Spring for 1500 CH 1000 1500 psig 17 30 7023 Spring Cart for 1000 1500 CH 18 30 7006 Standard Bearing Case...

Page 15: ...Jam Nut 316 2 25 1027 Diaphragm w Conv 3 25 1156 Bottom Spacer 4 95 2615 O rIng 012 5 25 1177 Bottom Piston Key Part Number Description 1 30 7016 Adapter Block 2 95 2665 O ring 145 3 98 3056 1 2 20 Ja...

Page 16: ...city Qsrc 2Qc Variables Qsrc supply regulator capacity Cv 0 0869 calculated with n 6 Travel Time Minimum travel time the time the valve takes to move from one extreme position to another is achieved w...

Page 17: ...eset Refer to the pilot initial adjustment procedures for further information Troubleshooting If the volume boosters bleed gas even when the control valve is not moving or if the control valve continu...

Page 18: ...ustment Assembly Procedures Note During assembly moisten all O rings threads thrust bearings and the recess in the spring seat with lightweight silicone grease Take special care to avoid applying grea...

Page 19: ...3 Baker Hughes Company All rights reserved Step 8 Place O ring 010 A in the adjusting orifice K2 Place the assembly in the orifice manifold M1 as shown Step 9 Place O ring 010 A in the nuts M2 and sec...

Page 20: ...the pilot base A1 to the bottom part of the body C with six 1 4 20 x 3 4 inch screws A2 Step 11 Place Lexan cover B1 in the outside of the pilot base A1 so that it protects the adjusting drum P after...

Page 21: ...nsion E onto the piston B Torque to 100 110 in lbs Figure 1 Assembling the diaphragm 175 CH Cartridge Assembly Insert 145 O ring F into the cartridge spacer G Place the cartridge spacer G between the...

Page 22: ...ing groove in the bottom flange K as shown Place the spacer N inside the bottom flange K 175 CH Piston Assembly Place Diaphragm Assembly onto Spacer N Making sure not to twist Diaphragm C thread Pisto...

Page 23: ...hes Company All rights reserved 175 CH Spring Chamber Assembly Bolt Spring Chamber H onto Cartridge Spacer G using six 6 Fiberglass Washers P and six 6 1 4 20 x 7 8 SHCS Q Bolt Bottom Flange K into Ca...

Page 24: ...he pistons 600 CH Spring Chamber Assembly Bolt the spring chamber D to the top body assembly H using six 6 fiberglass washers J and six 6 1 4 20 x 2 inch SHCS K Figure 8 Bolting the spring chamber 600...

Page 25: ...er K onto the top body assembly L Place the adapter block assembly onto the bottom spacer K Making sure not to twist the diaphragm C thread the small piston B into the outside piston M by holding the...

Page 26: ...Press fit the thrust bearing A into the bearing case B For all other CH models press fit the thrust bearing A into the bearing case C Figure 13 Thrust bearing assembly Bearing Nut Assembly All Models...

Page 27: ...pring J by spinning the assembly Make sure that the spring J touches no part of the screw E when spinning If the spring J does touch any part of the screw E then replace the spring J and repeat the te...

Page 28: ...own When firm engagement of the cap B is felt orient the cap B so that the mounting holes are in line with the top body assembly F pressure ports Bolt the cap B to the spring chamber G using six 6 1 4...

Page 29: ...cap assembly B to the spring chamber G using twelve 12 1 4 20 x 3 4 inch HHCS H Figure 22 Bolting the cap to the spring chamber 1000 1500 CH Thread Seal Assembly Place 7 16 inch SS thread seal I and 7...

Page 30: ...30 Baker Hughes Copyright 2023 Baker Hughes Company All rights reserved Part Silhouettes...

Page 31: ...Becker VRP CH Series Valve Regulator Pilot Instruction Manual 31 Copyright 2023 Baker Hughes Company All rights reserved Part Silhouettes...

Page 32: ...32 Baker Hughes Copyright 2023 Baker Hughes Company All rights reserved 30 7011 SMALL DIAPHRAGM FOR 1000 1300 CH SENSING ASSEMBLY Part Silhouettes...

Page 33: ...Becker VRP CH Series Valve Regulator Pilot Instruction Manual 33 Copyright 2023 Baker Hughes Company All rights reserved Notes...

Page 34: ...34 Baker Hughes Copyright 2023 Baker Hughes Company All rights reserved Notes...

Page 35: ...Becker VRP CH Series Valve Regulator Pilot Instruction Manual 35 Copyright 2023 Baker Hughes Company All rights reserved Notes...

Page 36: ...and fitness for a particular purpose or use Baker Hughes hereby disclaims any and all liability for any direct indirect consequential or special damages claims for lost profits or third party claims...

Reviews: