Masoneilan 41005 Series Globe Valves with API-6A Capabilities Instruction Manual
|
7
© 2023 Baker Hughes Company. All rights reserved.
Safety Information (cont.)
1. It is the end user’s responsibility to ensure properly
loaded and/or supported piping to avoid undesired
stresses on the product which may result in
damage to the product, loss of containment, or
loss of functionality and resulting unsafe states or
conditions.
2. It is the end user’s responsibility to correctly
identify end locations and place product in areas
that may contain explosive atmospheres. The
failure of properly following the test, installation,
maintenance and/or disassembly/assembly
instructions may result in a compromised product
which in turn could result in an uncontrolled/
unexpected loss of containment and release of
pressure.
3. It is the end user’s responsibility to take
appropriate actions to ensure that site personnel
who are performing installation, commissioning,
and maintenance have been trained in proper site
procedures for working with and around Baker
Hughes supplied equipment, per Safe Site Work
Practices, are the end user’s responsibility.
4. The failure of properly following the test,
installation, maintenance and/or disassembly/
assembly instructions may result in a
compromised product which in turn could result in
an uncontrolled /unexpected loss of containment
and release of pressure. It is the responsibility of
the person conducting the tasks listed above to
take great care in following such procedures.
5. It is the end user’s responsibility to:
Recognize and safely contain any leak.
Ensure proper Personal Protective Equipment
is available and used.
Follow Proper lifting techniques / equipment /
procedures, per Safe Site Work Practices.
6. Proper Lockout/Tagout of energy sources prior
to maintenance, per Safe Site Work Practices, is
the end user’s responsibility. This includes any
potential control signals or circuits that may have
a remote or automated control function over any
product. Instructions to properly release spring
stored energy included in IOM.
7. After installation or maintenance, it is the end
user’s responsibility to ensure the equipment has
been properly inspected and returned to proper
condition before being returned to service.
Summary of Contents for Masoneilan 41005 Series
Page 50: ...Notes...
Page 51: ...Notes...