background image

  

5

www.bainultra.com 

Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.

INSTALLATION INSTRUCTIONS | BAIN DE VILLE

TM

 

IMPORTANT 

SAFETY INSTRUCTIONS 

 

PERTAINING TO RISKS OF FIRE, ELECTROCUTION OR PERSONAL INJURY

READ AND FOLLOW ALL INSTRUCTIONS • SAVE THESE INSTRUCTIONS

THIS DOCUMENT SUPERCEDES THE INSTALLATION INSTRUCTION IN THE OWNER’S MANUAL. 

ELECTRICAL CONNECTIONS:

• Never drop or insert objects into any openings.
•   The Thermomasseur must be connected only to a supply circuit that is protected by a 20 amp class A ground fault circuit interrupter 

(GFCI). Optional therapies such as Chromatherapy and/or 2

nd

 heated backrest and/or WarmTouchShell

®

 must be connected to a supply 

circuit that is protected by a 15 amp class A ground fault circuit interrupter (GFCI). This interrupter is supplied by a certified electrician 
and must be tested on a regular basis in accordance with manufacturer’s instructions. The GFCI ground must be connected. If defec-
tive, do not use the Thermomasseur. Disconnect immediately and call a certified electrician.

•  Use 12 AWG (for 20 amp dedicated circuit) and 14 AWG (for 15 amp dedicated circuit) copper conductors that resist temperatures of at 

least 194 °F (90 °C)

• 

 Canada  only: 

for permanently connected units. A green-colored terminal (or a wire connector marked g., gr., ground or grounding) is 

provided within the terminal compartment (not applicable if unit supplied with an electric plug).  
To reduce the risk of electrocution, connect this terminal or connector to the grounding terminal of your electric service or supply panel 
with conductor equivalent in size to the circuit conductors supplying the equipment and be 12 AWG or more. 

•  All electrical connections must be carried out by a certified electrician and must respect federal, provincial/state, and local building codes 

and regulations.

• Install in accordance with manufacturer’s installation instructions.
•  For Geysair-equipped baths using remote turbine installation (not mounted on the bath), 

grounding continuity must be tested 

between the bath grounding terminal 

 

 and the bath power supply. 

Failure to perform the grounding continuity test could 

result in serious personal injury.

WATER LEAK TEST - IMPORTANT

•  

Once plumbing is fully installed and before beginning any other work, fill the ThermoMasseur with water to overflow  
level and wait 30 minutes. Check all plumbing hook-ups and bath for leaks. BainUltra is not responsible for any water 
damage caused by improper installation (see Warranty section in the Owner’s Manual).

Summary of Contents for BAIN DE VILLE

Page 1: ...BAIN DE VILLE TM INSTALLATION INSTRUCTIONS IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER T O BE KEPT BY THE OWNER ...

Page 2: ......

Page 3: ...UCTIONS 4 5 INTEGRATED WASTE OVERFLOW AND CABLE DRIVEN WASTE OVERFLOW KITS 7 INTEGRATED OVERFLOW CONNECTION PVC PIPE 8 BRASS PIPE 9 CABLE DRIVEN 10 BEDDING AND DRAIN POSITION 11 LEVELING AND TURBINE LOCATION 12 SECURING 13 FRAMING INSTRUCTIONS 14 REMOTE MOUNTING REMOTE TURBINE CONNECTION 15 16 REMOTE TURBINE ELECTRICAL CONNECTIONS 17 THERAPIES ELECTRICAL CONNECTIONS 18 ELECTRICAL DIAGRAMS 19 CUTTI...

Page 4: ...r alcohol before or during the use of a Hydro thermo massage bathtub equipped with a heater Use this unit only for its intended purposes or as described in this manual Use only accessories or devices recommended by the manu facturer Risk of hyperthermia and possible drowning Check and adjust water temperature before use Water temperature exceeding 100ºF 38ºC may be harmful to your health To reduce...

Page 5: ...cated circuit copper conductors that resist temperatures of at least 194 F 90 C Canada only for permanently connected units A green colored terminal or a wire connector marked g gr ground or grounding is provided within the terminal compartment not applicable if unit supplied with an electric plug To reduce the risk of electrocution connect this terminal or connector to the grounding terminal of y...

Page 6: ... Monday to Thursday from 8 a m to 6 p m EST Friday from 8 a m to 5 p m EST Printed in Canada Copyright December 2019 BainUltra Inc All rights reserved 45200689 BAIN DE VILLETM INSTALLATION INSTRUCTIONS BAIN DE VILLETM ...

Page 7: ...t applications or are protected by patents INSTALLATION INSTRUCTIONS BAIN DE VILLETM TITRE PVC WASTE OVERFLOW KIT THE LENGTH OF THE PIPE MAY VARY DEPENDING ON THE BATHTUB MODEL INTEGRATED WASTE OVERFLOW AND CABLE DRIVEN WASTE OVERFLOW KITS CABLE DRIVEN WASTE OVERFLOW KIT For front overflow tub BRASS WASTE OVERFLOW KIT ...

Page 8: ...hursday from 8 a m to 6 p m EST Friday from 8 a m to 5 p m EST Printed in Canada Copyright December 2019 BainUltra Inc All rights reserved 45200689 BAIN DE VILLETM INSTALLATION INSTRUCTIONS INTEGRATED OVERFLOW CONNECTION PVC PIPE ...

Page 9: ...ome products specifications and services mentioned in this manual are described in pending patent applications or are protected by patents INSTALLATION INSTRUCTIONS BAIN DE VILLETM INTEGRATED OVERFLOW CONNECTION BRASS PIPE ...

Page 10: ...ursday from 8 a m to 6 p m EST Friday from 8 a m to 5 p m EST Printed in Canada Copyright December 2019 BainUltra Inc All rights reserved 45200689 BAIN DE VILLETM INSTALLATION INSTRUCTIONS CABLE DRIVEN WASTE AND OVERFLOW CONNECTION ...

Page 11: ...ON X DIMENSION Y Bain de Ville 6030 10 3 8 14 1 8 Bain de Ville 6632 10 7 8 15 1 8 DRAIN POSITION BEDDING Before installing ensure that the floor underneath the bath can support 1 500 lbs 680 kg The bath may sit directly on the floor However the bath may also be installed on a bed of concrete For this type of installation it is recommended that you insulate the concrete between two sheets of plast...

Page 12: ...y to Thursday from 8 a m to 6 p m EST Friday from 8 a m to 5 p m EST Printed in Canada Copyright December 2019 BainUltra Inc All rights reserved 45200689 BAIN DE VILLETM INSTALLATION INSTRUCTIONS LEVELING AND TURBINE LOCATION ...

Page 13: ...w bainultra com Some products specifications and services mentioned in this manual are described in pending patent applications or are protected by patents INSTALLATION INSTRUCTIONS BAIN DE VILLETM SECURING ...

Page 14: ...ursday from 8 a m to 6 p m EST Friday from 8 a m to 5 p m EST Printed in Canada Copyright December 2019 BainUltra Inc All rights reserved 45200689 BAIN DE VILLETM INSTALLATION INSTRUCTIONS FRAMING INSTRUCTIONS Ceramic tiles Plywood ...

Page 15: ...specifications and services mentioned in this manual are described in pending patent applications or are protected by patents INSTALLATION INSTRUCTIONS BAIN DE VILLETM TURBINE REMOTE INSTALLATION SUGGESTED INSTALLATION Parts not included ...

Page 16: ...eventually fail and void its warranty 6 A 20 Amp GFCI 12AWG 120V dedicated line is needed for the turbine Geysair is powered by the turbine If you have additional options on the bath one or more a second dedicated line is needed 15 Amp GFCI 120V 14AWG GEYSAIR 1 Geysair is installed on the bathtub at the factory and must not be relocated It gets its power from your turbine So per your local electri...

Page 17: ...ly after all the low voltage wires are connected to turbine If this step has not been done simply disconnect main breaker that is linked to turbine Turbine must be located in a clean and dry space Geysair component cannot be remote mounted Must never be unplugged SEE P 19 FOR ELECTRICAL DIAGRAMS VOIR P 18 POUR SCHÉMAS ÉLECTRIQUES A AromaCloud Aromatherapy B Chromatherapy LED C Mia D MiaPlus Option...

Page 18: ...MS To GFCI OUTLET United States To GFCI OUTLET United States To Left LED Junction Box Canada Junction Box Canada A WarmTouchShell B Chromatherapy LED C DOT WarmTouchShell D DOT Chromatherapy LED E AromaCloud Aromatherapy Litestreme Inmix module AromaCloud A B E C D DOT WarmTouchShell WTS DOT Chromatherapy LED To Right LED WARNING All electrical connections must be carried out by a certified electr...

Page 19: ...IT 20A CIRCUIT NEUTRAL N L LOAD NEUTRAL N L LOAD GROUND FAULT CIRCUIT INTERRUPTERS GROUND FAULT CIRCUIT INTERRUPTERS JUNCTION BOX JUNCTION BOX TURBINE WITH GEYSAIR FOR MIAPLUS MIAMULTI TURBINE WITHOUT GEYSAIR FOR MIAPLUS MIAMULTI N L N L 20A THERMOMASSEUR 15A THERAPIES 15A CIRCUIT AIRSTREME WARMTOUCHSHELL N L N L NEUTRAL N L LOAD INMIX MODULE CHROMATHERAPY GROUND FAULT CIRCUIT INTERRUPTERS JUNCTIO...

Page 20: ...rou pour infrarouge MiaMulti Cut out for MiaMulti infrared 11 313 28 7 cm 1 063 2 7 cm 11 063 28 1 cm 1 625 4 1 cm 1 125 2 9 cm 1 375 3 5 cm 0 875 2 2 cm R0 125 R0 3 cm 1 625 0 04 4 1 cm 0 1 cm AIR INTAKE OPEN PRISE D AIR OUVER Trou pour infrarouge MiaMulti Cut out for MiaMulti infrared 1 063 2 7 cm 1 625 4 1 cm 1 125 2 9 cm 1 375 3 5 cm 0 875 2 2 cm R0 125 R0 3 cm AI PRIS Trou pour infrarouge Mia...

Page 21: ......

Reviews: