5
www.bainultra.com
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
INSTALLATION INSTRUCTIONS | BAIN DE VILLE
TM
IMPORTANT
SAFETY INSTRUCTIONS
PERTAINING TO RISKS OF FIRE, ELECTROCUTION OR PERSONAL INJURY
READ AND FOLLOW ALL INSTRUCTIONS • SAVE THESE INSTRUCTIONS
THIS DOCUMENT SUPERCEDES THE INSTALLATION INSTRUCTION IN THE OWNER’S MANUAL.
ELECTRICAL CONNECTIONS:
• Never drop or insert objects into any openings.
• The Thermomasseur must be connected only to a supply circuit that is protected by a 20 amp class A ground fault circuit interrupter
(GFCI). Optional therapies such as Chromatherapy and/or 2
nd
heated backrest and/or WarmTouchShell
®
must be connected to a supply
circuit that is protected by a 15 amp class A ground fault circuit interrupter (GFCI). This interrupter is supplied by a certified electrician
and must be tested on a regular basis in accordance with manufacturer’s instructions. The GFCI ground must be connected. If defec-
tive, do not use the Thermomasseur. Disconnect immediately and call a certified electrician.
• Use 12 AWG (for 20 amp dedicated circuit) and 14 AWG (for 15 amp dedicated circuit) copper conductors that resist temperatures of at
least 194 °F (90 °C)
•
Canada only:
for permanently connected units. A green-colored terminal (or a wire connector marked g., gr., ground or grounding) is
provided within the terminal compartment (not applicable if unit supplied with an electric plug).
To reduce the risk of electrocution, connect this terminal or connector to the grounding terminal of your electric service or supply panel
with conductor equivalent in size to the circuit conductors supplying the equipment and be 12 AWG or more.
• All electrical connections must be carried out by a certified electrician and must respect federal, provincial/state, and local building codes
and regulations.
• Install in accordance with manufacturer’s installation instructions.
• For Geysair-equipped baths using remote turbine installation (not mounted on the bath),
grounding continuity must be tested
between the bath grounding terminal
and the bath power supply.
Failure to perform the grounding continuity test could
result in serious personal injury.
WATER LEAK TEST - IMPORTANT
•
Once plumbing is fully installed and before beginning any other work, fill the ThermoMasseur with water to overflow
level and wait 30 minutes. Check all plumbing hook-ups and bath for leaks. BainUltra is not responsible for any water
damage caused by improper installation (see Warranty section in the Owner’s Manual).