Baintech BTBLUELITH12/200 Installation Manual Download Page 4

AU

STRALIAN

O

W

N

E D

  &   O P E R

AT

E

D

Before you begin: Always consult professionals for complex systems.

Inspect Battery and Connections: Check for any damage, defects, or incorrect wiring.
Ensure all connections are secure and in good condition.

Program Chargers and Inverters for Lithium: Configure charger and inverter settings
for compatibility with lithium batteries.

Calibrate Shunt to 100% SOC (State of Charge) (if applicable): If required, calibrate
the shunt to read 100% state of charge accurately.

Perform Discharge Test and System Check: Verify proper system function and ensure
there are no hot connections or wiring issues.

NOTE: PLEASE CHARGE FULLY BEFORE USE. 

Remember, safety and accuracy are paramount. Always seek professional advice.

Inquire Now!

BAINTECH LITHIUM BATTERY

COMMISSIONING QUICK GUIDE (Clause

5.4.12.3.5)

NOW AVAILABLE

Baintech Powerboards

Available in 

3000W

 Inverter

Summary of Contents for BTBLUELITH12/200

Page 1: ...reading the full standard and ensuring their installation complies This guide serves as a helpful reference but should not replace a comprehensive understanding of the standard s requirements This gui...

Page 2: ...enter the habitable area of the structure and c be installed to operate within the manufacturer s defined operating temperatures including IP rating and d be installed in a suitable battery container...

Page 3: ...r mounting bolts slot for straps Model Product Size Chart Battery Dimension Battery Weight 110AH SKU 150AH SKU 200AH SKU 300AH SKU 260 168 209 mm 307 169 208 mm 307 169 208 mm 345 190 245 mm 11 5 kg 1...

Page 4: ...lity with lithium batteries Calibrate Shunt to 100 SOC State of Charge if applicable If required calibrate the shunt to read 100 state of charge accurately Perform Discharge Test and System Check Veri...

Page 5: ...structure in an enclosure i e under the floor on the drawbar Requirements for install The space must be sealed off from the habitable area of the structure and vented externally to be classified as I...

Page 6: ...or two Batteries Working Temperature 20 60 Charging Mode CC CV Charging Voltage 14 2V 14 6V Recommended Charging Current 75A per Battery When Installed in a pair 150A Charge for two Batteries Charging...

Page 7: ...arging Current 100A per Battery When Installed in a pair 200A Charge for two Batteries Charging Temperature 0 C 55 C Includes bluetooth capability Baintech Bluetooth App Introducing the Baintech Bluet...

Page 8: ...07 3348 8082 1224 Lytton Road Hemmant Q 4174 sales baintech com au A USTRALIA N O W N E D O P E R A T E D Get in touch with us...

Reviews: