INSTALLATION
UNPACKING AND INSPECTION
2 - 2
I-E96-403A
®
UNPACKING AND INSPECTION
These are steps to follow for general handling:
1. Examine the unit to make sure that no damage has
occurred in transit.
2. Notify the nearest Bailey Controls sales office of any dam-
age.
3. File a claim for any damage with the shipping company
that handled the shipment.
4. Use the original packing material or container to store the
unit.
5. Store the unit in a place with clean air; free from extremes
of temperature and humidity.
SETUP/PHYSICAL INSTALLATION
This section explains how to configure and install the NTAI02.
The required procedures are installing the termination unit
into the FTP, and connecting the field wiring and cables.
Fuses
The TU has a Fuse (F1) for the +24 volt supply. It is a 0.25
amp, 250 volt fuse (Bailey part number 194776A12500). The
TU is shipped with the fuse installed in fuse holder F1.
Termination Unit Configuration
No configuration is necessary to operate the TU. Switch S1 is
used for internal or external calibration of input circuits. To
calibrate the TU, follow the procedure in the
Analog Master
Module and Analog Slave Modules (IMAMM03 and
IMASM01/02/03/04)
manual.
Termination Unit Installation
The TU mounts on a standard Field Termination Panel
(NFTP01). Figure
shows how to secure the termination unit
to the FTP.
To install the termination unit:
1. Make sure power is off to the cabinet.
2. Insert the termination unit tabs into the slots in the outside
edge of the termination panel.
3. Mount the TU to the field termination panel with the two,
number 10, ¾ inch screws. Do not over-tighten the screws.