I-E96-217A
6 - 1
SECTION 6 - MAINTENANCE
INTRODUCTION
The Serial Port Module (SPM) requires limited maintenance.
This section contains a maintenance schedule for the SPM and
other INFI 90 assemblies.
MAINTENANCE SCHEDULE
Perform the tasks in Table
at the specified intervals.
Table 6-1. Maintenance Schedule
Task
Interval
Clean and tighten all power and
grounding connections
Every 6 months or during plant shut-
down, whichever occurs first.
Use a static safe vacuum cleaner to
remove dust from:
Modules
Module Mounting Unit
Fan Assembly
Power Entry Panel
Termination Units/Modules
Every 6 months or during plant shut-
down, whichever occurs first.