19
19
10. Assemble and tighten Hose (NO.39) on
Cone (NO.33) and Drum lid (NO.40) with
Hose clamp (NO.38). See FIG. 8
11. Put the PE Bag (NO. 87) into the Drum
(NO. 48v1) first, then placed the inner
frame inside the PE bag in order (Fig.8) to
press the bag down. See FIG. 9
12. Pull down the Quick Lever, and then
assemble Drum Lid (No.40) and Quick
Lever with Nut (No.41).
Fig. 8
Fig. 9
Summary of Contents for DC-1450C
Page 22: ...20 20 13 All the assembly steps are completed See FIG 10 Fig 10...
Page 26: ...24 24 EXPLODED DIAGRAM...
Page 30: ...28 28 NOTES...
Page 31: ...29 29 NOTES...