![Baicells Nova-227 Installation Manual Download Page 9](http://html1.mh-extra.com/html/baicells/nova-227/nova-227_installation-manual_3458775009.webp)
7
Connect Cable
2.4
Before connect cables, unscrew the three screws on the cover of wiring cavity using M4
cross screwdriver and open the wiring cavity.
After complete the connection, close the cover and fasten screws.
Note
: If the base station need to debug, connect the LAN interface to PC first and configure the IP
address of the PC with 192.168.150.x.
Connect Ground Cable
2.5
CAUTION
:
It is unlikely to happen but since the LTE eNodeB is a kind of very sophisticated
equipment, so it is recommended to test it on the ground to make sure everything is
functioning before install on the tower.
Power ON
2.6
After the Nove-227 is powered on, indicators can hint the status of the eNodeB.