Connect Cable 

2.4

Before connect cables, unscrew the three screws on the cover of wiring cavity using M4 

cross screwdriver and open the wiring cavity. 

After complete the connection, close the cover and fasten screws. 

Note

:  If  the  base  station  need  to  debug,  connect  the  LAN  interface  to  PC  first  and  configure  the  IP 

address of the PC with 192.168.150.x. 

 

 

Connect Ground Cable 

2.5

CAUTION

It  is  unlikely  to  happen  but  since  the  LTE  eNodeB  is  a  kind  of  very  sophisticated 

equipment,  so  it  is  recommended  to  test  it  on  the  ground  to  make  sure  everything  is 

functioning before install on the tower. 

 

 

Power ON 

2.6

After the Nove-227 is powered on, indicators can hint the status of the eNodeB. 

Summary of Contents for Nova-227

Page 1: ...Nova 227 Outdoor LTE TDD eNodeB Installation Guide P N 1701000123 Version 01 All rights reserved Baicells Technologies Co Ltd...

Page 2: ...ecification may be reproduced in any form or means without the prior written consent of Baicells Disclaimer This specification is preliminary and is subject to change at any time without notice Baicel...

Page 3: ...Adopt the integration design of baseband and RF flexible to deploy Based on 3GPP international standard LTE TDD technology provide high speed data service support a maximum transfer rate of DL 110Mbit...

Page 4: ...ova 227 Interface Indicators Identity Color Status Description PWR Green Steady On Power On OFF No Power Supply ACT Green Steady On The cell is activated OFF The cell is not activated RUN Green Fast f...

Page 5: ...width 65 vertical beam width 20 Polarization mode 45 Overall Power 20 W Power Supply PoE IEEE802 3at standard Weight About 2 0 kg The model pBS2120 only support 10MHz 20MHz Note The test method of re...

Page 6: ...upport remote local maintenance based on SSH protocol Support remote maintenance Support online status management Support performance statistics Support failure management Support configuration manage...

Page 7: ...avoided Places prone to have impounded water soaking leakage or condensation should also be avoided Factors like climate hydrology geology earthquake electric power and transportation should be taken...

Page 8: ...6 Install on Pole 2 2 Install on Wall 2 3 Note According to the situation of the installation site the angle of the eNodeB can be adjusted...

Page 9: ...need to debug connect the LAN interface to PC first and configure the IP address of the PC with 192 168 150 x Connect Ground Cable 2 5 CAUTION It is unlikely to happen but since the LTE eNodeB is a k...

Page 10: ...nd can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interf...

Reviews: