• Follow directions provided by manufacturer and these instructions.
6+,1*/(6
- NOT INCLUDED -
Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel.
Use (4) nails per shingle.
Starter row must be straight and level all the way across with lower edge of roof deck.
NOTE:
If you have installed drip edge install shingles flush to drip edge.
BEGIN
1
TABS UP
Shingle overlaps
roof decking.
1" (2,5 cm) overhang
past roof deck.
1" (2,5 cm) overhang
or flush with drip
edge.
(4) Nails
BACK OF
SHED
FRONT OF
SHED
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
Familiarize yourself with a 3-Tab Shingle.
6+,1*/(1$,/3$77(51
Full Rain Slot
Half A Rain Slot
Notch
Notch
46
Summary of Contents for Yardline BRAMPTON 10 x 8
Page 1: ......
Page 2: ......
Page 3: ...1 ...
Page 4: ...2 ...
Page 5: ...3 ...
Page 6: ...4 ...
Page 7: ...5 ...
Page 8: ...6 ...
Page 9: ...7 ...
Page 10: ...8 ...
Page 11: ...9 ...
Page 12: ...10 ...
Page 13: ...11 ...
Page 14: ...12 ...
Page 15: ...13 ...
Page 16: ...14 ...
Page 17: ...15 ...
Page 18: ...16 ...
Page 19: ...17 ...
Page 20: ...18 ...
Page 21: ...19 ...
Page 22: ...20 ...
Page 23: ...21 ...
Page 24: ...22 ...
Page 25: ...23 ...
Page 26: ...24 ...
Page 27: ...25 ...
Page 28: ...26 ...
Page 29: ...27 ...
Page 30: ...28 ...
Page 31: ...29 ...
Page 32: ...30 ...
Page 33: ...31 ...
Page 34: ...32 ...
Page 35: ...33 ...
Page 36: ...34 ...
Page 37: ...35 ...
Page 38: ...36 ...
Page 39: ...37 ...
Page 40: ...38 ...
Page 41: ...39 ...
Page 42: ...40 ...
Page 43: ...41 ...
Page 44: ...42 ...
Page 45: ...43 ...
Page 46: ...44 ...