background image

Summary of Contents for Yardline BRAMPTON 10 x 8

Page 1: ......

Page 2: ......

Page 3: ...1 ...

Page 4: ...2 ...

Page 5: ...3 ...

Page 6: ...4 ...

Page 7: ...5 ...

Page 8: ...6 ...

Page 9: ...7 ...

Page 10: ...8 ...

Page 11: ...9 ...

Page 12: ...10 ...

Page 13: ...11 ...

Page 14: ...12 ...

Page 15: ...13 ...

Page 16: ...14 ...

Page 17: ...15 ...

Page 18: ...16 ...

Page 19: ...17 ...

Page 20: ...18 ...

Page 21: ...19 ...

Page 22: ...20 ...

Page 23: ...21 ...

Page 24: ...22 ...

Page 25: ...23 ...

Page 26: ...24 ...

Page 27: ...25 ...

Page 28: ...26 ...

Page 29: ...27 ...

Page 30: ...28 ...

Page 31: ...29 ...

Page 32: ...30 ...

Page 33: ...31 ...

Page 34: ...32 ...

Page 35: ...33 ...

Page 36: ...34 ...

Page 37: ...35 ...

Page 38: ...36 ...

Page 39: ...37 ...

Page 40: ...38 ...

Page 41: ...39 ...

Page 42: ...40 ...

Page 43: ...41 ...

Page 44: ...42 ...

Page 45: ...43 ...

Page 46: ...44 ...

Page 47: ...DGES OvErLAPPING 5SE MINIMAL AMOUNT OF ROOlNG NAILS TO HOLD IN PLACE OK to overlap at ridge 3 7 6 cm OVERLAP Flush Flush PARTS REQUIRED PAINT CAULK O4 5 ROOF FELT O4 5 DRIP EDGE O4 5 3NIP BOTTOM SIDE OF DrIP EDGE AND BEND OvER TO OTHER SIDE OF ROOf FOllOW DiRECTiONS PROviDED bY MANUfACTUREr s NSTALL DrIP EDGE OvER ROOF fELT ON GAbLE SIDE AND UNDER ROOF fELT ON EAvE SIDE Fig A s O NOT USE NAILS ON ...

Page 48: ...rter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shin...

Page 49: ... with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 RIGHT SIDE OF SHED LEFT SIDE OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Flush with rain slots Flush with rain slots Flush with rain slots F...

Page 50: ...ge cut to peak with a utility knife Repeat steps 1 6 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line 5 6 7 8 6 1 6 continued If more than 5 12 7 cm to rain slot you must install another row of shingles 5 12 7 cm or less 5 12 7 c...

Page 51: ...t off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED Flush 28 to 30 Pieces 49 ...

Page 52: ...tween the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH 8 Cut at top of rain slot Flush to shingles Trim cap off flush to shingles Cap 4 10 2 cm 50 ...

Page 53: ...and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas Timber Buildings To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exterior ...

Reviews: